IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

57

matching recommendations
Reset
NAICS 3399 Other Miscellaneous Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0859 # 03 Y:2023 03 2023 RECOVER WASTE HEAT FROM EQUIPMENT $20,649 $46,300 n/a
MA0859 # 06 Y:2023 06 2023 RECOVER WASTE HEAT FROM EQUIPMENT $28,671 $72,000 n/a
MA0859 # 04 Y:2023 04 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $13,456 $15,900 n/a
MA0859 # 02 Y:2023 02 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $166,304 $1,812,686 n/a
MA0859 # 05 Y:2023 05 2023 RECOVER WASTE HEAT FROM EQUIPMENT $11,753 $40,550 n/a
MA0859 # 01 Y:2023 01 2023 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $1,034,369 $4,078,943 n/a
MA0848 # 04 Y:2023 04 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,130 $26,000 Implemented
MA0848 # 03 Y:2023 03 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $14,335 $15,950 Implemented
MA0848 # 02 Y:2023 02 2023 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $26,885 $30,500 Not Implemented
MA0848 # 01 Y:2023 01 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $285,734 $2,502,664 Not Implemented
MA0848 # 05 Y:2023 05 2023 ADJUST VENTS TO MINIMIZE ENERGY USE $5,306 $6,125 Not Implemented
MA0825 # 01 Y:2021 01 2021 OPTIMIZE PLANT POWER FACTOR $93,702 $30,000 Implemented
MA0825 # 02 Y:2021 02 2021 RECOVER WASTE HEAT FROM EQUIPMENT $54,067 $150,000 Implemented
MA0825 # 05 Y:2021 05 2021 MINIMIZE WATER USAGE $24,897 $6,250 Implemented
MA0825 # 04 Y:2021 04 2021 INSTALL TIMERS AND/OR THERMOSTATS $35,925 $3,200 Not Implemented
MA0825 # 03 Y:2021 03 2021 RECOVER WASTE HEAT FROM EQUIPMENT $41,012 $52,945 Implemented
MAS027 # 03 Y:2012 03 2012 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $2,336 $500 Not Implemented
MAS027 # 01 Y:2012 01 2012 REDUCE VENTILATION AIR $23,907 $33,500 Not Implemented
MAS027 # 02 Y:2012 02 2012 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $11,449 $28,000 Not Implemented
MAS021 # 03 Y:2012 03 2012 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $18,123 $77,100 Not Implemented
MAS021 # 04 Y:2012 04 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,077 $8,000 Implemented
MAS021 # 05 Y:2012 05 2012 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $4,883 $3,120 Implemented
MAS021 # 06 Y:2012 06 2012 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $3,590 $3,120 Implemented
MAS021 # 07 Y:2012 07 2012 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,154 $2,000 Not Implemented
MAS021 # 02 Y:2012 02 2012 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $36,978 $9,000 Not Implemented