IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

103

matching recommendations
Reset
NAICS 33999 All Other Miscellaneous Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0771 # 06 Y:2007 06 2007 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,180 $0 Implemented
UD0771 # 02 Y:2007 02 2007 RECOVER WASTE HEAT FROM EQUIPMENT $5,342 $600 Not Implemented
UD0768 # 04 Y:2007 04 2007 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $8,081 $4,600 Not Implemented
UD0768 # 03 Y:2007 03 2007 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $10,780 $20,512 Not Implemented
UD0768 # 05 Y:2007 05 2007 REPLACE BOILER $5,791 $40,000 Not Implemented
UD0768 # 08 Y:2007 08 2007 INSTALL TIMERS AND/OR THERMOSTATS $1,410 $400 Not Implemented
UD0768 # 09 Y:2007 09 2007 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $860 $0 Implemented
UD0768 # 07 Y:2007 07 2007 UPGRADE CONTROLS ON COMPRESSORS $2,180 $0 Implemented
UD0768 # 01 Y:2007 01 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,680 $80,800 Not Implemented
UD0768 # 02 Y:2007 02 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,440 $46,362 Not Implemented
UD0768 # 06 Y:2007 06 2007 TURN OFF EQUIPMENT WHEN NOT IN USE $5,131 $1,000 Not Implemented
UD0734 # 01 Y:2006 01 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,890 $19,500 Implemented
UD0734 # 02 Y:2006 02 2006 UPGRADE CONTROLS ON COMPRESSORS $5,301 $0 Not Implemented
UD0734 # 03 Y:2006 03 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,023 $1,900 Implemented
UD0734 # 04 Y:2006 04 2006 MINIMIZE NON-ESSENTIAL MATERIAL IN HEAT TREATMENT PROCESS $2,800 $0 Implemented
UD0734 # 05 Y:2006 05 2006 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $2,510 $0 Implemented
UD0734 # 06 Y:2006 06 2006 USE OPTIMUM THICKNESS INSULATION $2,141 $3,500 Not Implemented
UD0734 # 07 Y:2006 07 2006 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $1,798 $8,041 Implemented
UD0734 # 08 Y:2006 08 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $935 $0 Not Implemented
UD0734 # 09 Y:2006 09 2006 REDUCE VENTILATION AIR $750 $0 Implemented
UD0734 # 10 Y:2006 10 2006 USE PHOTOCELL CONTROLS $477 $275 Implemented
UD0734 # 11 Y:2006 11 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $465 $53 Implemented
UD0730 # 05 Y:2005 05 2005 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $6,473 $12,880 Implemented
UD0730 # 04 Y:2005 04 2005 COVER OPEN TANKS $12,069 $2,170 Not Implemented
UD0730 # 03 Y:2005 03 2005 MINIMIZE NON-ESSENTIAL MATERIAL IN HEAT TREATMENT PROCESS $13,381 $25,000 Not Implemented