Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
26
matching recommendationsNAICS | 33999 | All Other Miscellaneous Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UU0237 # 07 Y:2024 | 07 | 2024 | PAY UTILITY BILLS ON TIME | $210 | $150 | Implemented |
UU0237 # 06 Y:2024 | 06 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,040 | $375 | Not Implemented |
UU0237 # 05 Y:2024 | 05 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,430 | $3,000 | Implemented |
UU0237 # 04 Y:2024 | 04 | 2024 | TURN OFF EQUIPMENT WHEN NOT IN USE | $6,350 | $8,970 | Implemented |
UU0237 # 03 Y:2024 | 03 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,340 | $23,500 | Implemented |
UU0237 # 02 Y:2024 | 02 | 2024 | REDUCE VENTILATION AIR | $7,109 | $28,950 | Implemented |
UU0237 # 01 Y:2024 | 01 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $10,990 | $184,280 | Implemented |
UU0204 # 02 Y:2022 | 02 | 2022 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $13,275 | $12,600 | Not Implemented |
UU0204 # 10 Y:2022 | 10 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $825 | $900 | Not Implemented |
UU0204 # 01 Y:2022 | 01 | 2022 | TURN OFF EQUIPMENT WHEN NOT IN USE | $45,240 | $17,600 | Not Implemented |
UU0204 # 03 Y:2022 | 03 | 2022 | REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT | $10,674 | $25,650 | Not Implemented |
UU0204 # 04 Y:2022 | 04 | 2022 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $7,347 | $5,215 | Not Implemented |
UU0204 # 05 Y:2022 | 05 | 2022 | UPGRADE CONTROLS ON COMPRESSORS | $4,414 | $1,000 | Not Implemented |
UU0204 # 06 Y:2022 | 06 | 2022 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $4,228 | $2,448 | Not Implemented |
UU0204 # 07 Y:2022 | 07 | 2022 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $2,552 | $4,497 | Not Implemented |
UU0204 # 08 Y:2022 | 08 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,260 | $3,781 | Not Implemented |
UU0204 # 09 Y:2022 | 09 | 2022 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $1,637 | $1,536 | Not Implemented |
UU0144 # 03 Y:2019 | 03 | 2019 | OPTIMIZE PLANT POWER FACTOR | $6,190 | $6,000 | Not Implemented |
UU0144 # 04 Y:2019 | 04 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,420 | $128 | Implemented |
UU0144 # 02 Y:2019 | 02 | 2019 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $16,349 | $400 | Implemented |
UU0144 # 01 Y:2019 | 01 | 2019 | INSULATE BARE EQUIPMENT | $42,296 | $1,068 | Implemented |
UU0070 # 05 Y:2004 | 05 | 2004 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $70,000 | $18,000 | Implemented |
UU0070 # 04 Y:2004 | 04 | 2004 | RECOVERY METALS FROM RINSE WATER(EVAP., ION EXCHANGE, RO, ELECTROLYSIS, ELECTRODIALYSIS) AND REUSE RINSE WATER | $73,401 | $750,000 | Implemented |
UU0070 # 03 Y:2004 | 03 | 2004 | OPTIMIZE PLANT POWER FACTOR | $16,729 | $26,520 | Not Implemented |
UU0070 # 02 Y:2004 | 02 | 2004 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $95,199 | $0 | Implemented |