IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

26

matching recommendations
Reset
NAICS 33999 All Other Miscellaneous Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0237 # 07 Y:2024 07 2024 PAY UTILITY BILLS ON TIME $210 $150 Implemented
UU0237 # 06 Y:2024 06 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,040 $375 Not Implemented
UU0237 # 05 Y:2024 05 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,430 $3,000 Implemented
UU0237 # 04 Y:2024 04 2024 TURN OFF EQUIPMENT WHEN NOT IN USE $6,350 $8,970 Implemented
UU0237 # 03 Y:2024 03 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,340 $23,500 Implemented
UU0237 # 02 Y:2024 02 2024 REDUCE VENTILATION AIR $7,109 $28,950 Implemented
UU0237 # 01 Y:2024 01 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $10,990 $184,280 Implemented
UU0204 # 02 Y:2022 02 2022 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $13,275 $12,600 Not Implemented
UU0204 # 10 Y:2022 10 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $825 $900 Not Implemented
UU0204 # 01 Y:2022 01 2022 TURN OFF EQUIPMENT WHEN NOT IN USE $45,240 $17,600 Not Implemented
UU0204 # 03 Y:2022 03 2022 REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT $10,674 $25,650 Not Implemented
UU0204 # 04 Y:2022 04 2022 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $7,347 $5,215 Not Implemented
UU0204 # 05 Y:2022 05 2022 UPGRADE CONTROLS ON COMPRESSORS $4,414 $1,000 Not Implemented
UU0204 # 06 Y:2022 06 2022 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $4,228 $2,448 Not Implemented
UU0204 # 07 Y:2022 07 2022 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $2,552 $4,497 Not Implemented
UU0204 # 08 Y:2022 08 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,260 $3,781 Not Implemented
UU0204 # 09 Y:2022 09 2022 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $1,637 $1,536 Not Implemented
UU0144 # 03 Y:2019 03 2019 OPTIMIZE PLANT POWER FACTOR $6,190 $6,000 Not Implemented
UU0144 # 04 Y:2019 04 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,420 $128 Implemented
UU0144 # 02 Y:2019 02 2019 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $16,349 $400 Implemented
UU0144 # 01 Y:2019 01 2019 INSULATE BARE EQUIPMENT $42,296 $1,068 Implemented
UU0070 # 05 Y:2004 05 2004 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $70,000 $18,000 Implemented
UU0070 # 04 Y:2004 04 2004 RECOVERY METALS FROM RINSE WATER(EVAP., ION EXCHANGE, RO, ELECTROLYSIS, ELECTRODIALYSIS) AND REUSE RINSE WATER $73,401 $750,000 Implemented
UU0070 # 03 Y:2004 03 2004 OPTIMIZE PLANT POWER FACTOR $16,729 $26,520 Not Implemented
UU0070 # 02 Y:2004 02 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $95,199 $0 Implemented