IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

350

matching recommendations
Reset
NAICS 339991 Gasket, Packing, and Sealing Device Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MAS021 # 07 Y:2012 07 2012 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,154 $2,000 Not Implemented
AM0606 # 01 Y:2012 01 2012 OPTIMIZE PLANT POWER FACTOR $8,320 $16,340 Not Implemented
AM0606 # 02 Y:2012 02 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,915 $1,000 Not Implemented
AM0606 # 03 Y:2012 03 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $900 $3,110 Implemented
AM0606 # 04 Y:2012 04 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $795 $20 Not Implemented
AM0606 # 05 Y:2012 05 2012 INSTALL SKYLIGHTS $410 $880 Not Implemented
AM0606 # 06 Y:2012 06 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $325 $20 Not Implemented
AM0606 # 07 Y:2012 07 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $175 $200 Not Implemented
AM0606 # 08 Y:2012 08 2012 USE PHOTOCELL CONTROLS $175 $100 Not Implemented
SD0444 # 01 Y:2012 01 2012 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,992 $100 Implemented
SD0444 # 02 Y:2012 02 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,090 $1,100 Not Implemented
SD0444 # 03 Y:2012 03 2012 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $1,113 $272 Implemented
SD0444 # 04 Y:2012 04 2012 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $740 $653 Implemented
SD0444 # 05 Y:2012 05 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,560 $14,000 Not Implemented
SD0444 # 06 Y:2012 06 2012 INSTALL OCCUPANCY SENSORS $1,892 $3,792 Not Implemented
SD0444 # 07 Y:2012 07 2012 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $28,752 $68,368 Not Implemented
SD0444 # 08 Y:2012 08 2012 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $7,873 $20,250 Not Implemented
MAS018 # 01 Y:2012 01 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $83,121 $172,430 Not Implemented
MAS018 # 02 Y:2012 02 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $22,975 $6,000 Not Implemented
MAS018 # 03 Y:2012 03 2012 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $29,548 $92,700 Not Implemented
MAS018 # 04 Y:2012 04 2012 REDUCE VENTILATION AIR $19,133 $2,100 Not Implemented
MAS018 # 05 Y:2012 05 2012 TURN OFF EQUIPMENT WHEN NOT IN USE $10,200 $1,775 Not Implemented
MAS018 # 06 Y:2012 06 2012 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $6,270 $22,500 Not Implemented
MAS018 # 07 Y:2012 07 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,027 $0 Not Implemented
MAS018 # 08 Y:2012 08 2012 REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY $2,045 $4,600 Not Implemented