IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

26

matching recommendations
Reset
NAICS 488 Support Activities for Transportation
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0557 # 03 Y:2023 03 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $1,986 $19,728 Implemented
AS0557 # 05 Y:2023 05 2023 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $333 $284 Implemented
AS0557 # 07 Y:2023 07 2023 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $46 $294 Implemented
AS0557 # 02 Y:2023 02 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,169 $2,419 Implemented
UF0580 # 03 Y:2022 03 2022 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $18,832 $31,696 Implemented
UF0580 # 09 Y:2022 09 2022 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,516 $594 Implemented
UF0580 # 08 Y:2022 08 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,370 $10,501 Implemented
UF0580 # 07 Y:2022 07 2022 INSTALL OCCUPANCY SENSORS $3,037 $2,270 Implemented
UF0580 # 06 Y:2022 06 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,465 $8,588 Implemented
UF0580 # 04 Y:2022 04 2022 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $11,115 $20,214 Implemented
UF0580 # 02 Y:2022 02 2022 USE DEMAND CONTROLLER OR LOAD SHEDDER $44,200 $57,498 Implemented
LS0522 # 04 Y:2022 04 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,124 $3,917 Implemented
LS0522 # 02 Y:2022 02 2022 INSTALL OCCUPANCY SENSORS $57 $25 Implemented
LS0522 # 01 Y:2022 01 2022 INSTALL TIMERS AND/OR THERMOSTATS $1,249 $38 Implemented
WV0600 # 06 Y:2020 06 2020 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $138 $750 Implemented
WV0600 # 01 Y:2020 01 2020 INSTALL OCCUPANCY SENSORS $9,760 $21,875 Implemented
BD0450 # 03 Y:2014 03 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,837 $1,000 Implemented
BD0450 # 04 Y:2014 04 2014 UPGRADE OBSOLETE EQUIPMENT $2,486 $20 Implemented
BD0450 # 05 Y:2014 05 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,148 $2,850 Implemented
LL0364 # 03 Y:2012 03 2012 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $3,717 $600 Implemented
LL0364 # 02 Y:2012 02 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $10,159 $30 Implemented
LL0364 # 01 Y:2012 01 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $20,983 $2,990 Implemented
SD0429 # 02 Y:2010 02 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $340 $100 Implemented
SU0157 # 04 Y:2003 04 2003 TURN OFF EQUIPMENT WHEN NOT IN USE $1,835 $0 Implemented
SU0157 # 07 Y:2003 07 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,147 $0 Implemented