Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
29
matching recommendationsSIC | 10 | Mining |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0424 # 06 Y:2002 | 06 | 2002 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $25,349 | $0 | Not Implemented |
OR0424 # 05 Y:2002 | 05 | 2002 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $69,350 | $46,000 | Implemented |
OR0424 # 09 Y:2002 | 09 | 2002 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $14,715 | $45,000 | Not Implemented |
OR0424 # 04 Y:2002 | 04 | 2002 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $119,700 | $241,870 | Not Implemented |
OR0424 # 03 Y:2002 | 03 | 2002 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $158,150 | $118,500 | n/a |
OR0424 # 08 Y:2002 | 08 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $13,470 | $12,200 | Implemented |
OR0424 # 07 Y:2002 | 07 | 2002 | ADJUST BURNERS FOR EFFICIENT OPERATION | $20,311 | $1,000 | Implemented |
OR0424 # 02 Y:2002 | 02 | 2002 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $958,574 | $1,727,000 | Not Implemented |
OR0424 # 01 Y:2002 | 01 | 2002 | RELOCATE OVEN / FURNACE TO MORE EFFICIENT LOCATION | $577,590 | $207,147 | n/a |
OR0423 # 06 Y:2002 | 06 | 2002 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $279,200 | $2,000,000 | Not Implemented |
OR0423 # 05 Y:2002 | 05 | 2002 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $38,900 | $0 | Implemented |
OR0423 # 04 Y:2002 | 04 | 2002 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $35,800 | $20,700 | Implemented |
OR0423 # 03 Y:2002 | 03 | 2002 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $183,000 | $120,860 | Not Implemented |
OR0423 # 01 Y:2002 | 01 | 2002 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $518,000 | $300,000 | Not Implemented |
OR0423 # 02 Y:2002 | 02 | 2002 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $489,000 | $410,000 | n/a |
CO0516 # 06 Y:2002 | 06 | 2002 | INSULATE BARE EQUIPMENT | $4,380 | $900 | Implemented |
CO0516 # 05 Y:2002 | 05 | 2002 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $9,370 | $2,480 | Implemented |
CO0516 # 04 Y:2002 | 04 | 2002 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $19,300 | $38,900 | Not Implemented |
CO0516 # 03 Y:2002 | 03 | 2002 | IMPROVE COMBUSTION CONTROL CAPABILITY | $44,200 | $30,000 | n/a |
CO0516 # 02 Y:2002 | 02 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $90,030 | $21,080 | Implemented |
CO0516 # 01 Y:2002 | 01 | 2002 | INSTALL WIND POWERED ELECTRIC GENERATOR | $616,200 | $4,800,000 | Not Implemented |
CO0515 # 01 Y:2002 | 01 | 2002 | UPGRADE CONTROLS ON COMPRESSORS | $167,740 | $45,000 | Implemented |
CO0515 # 06 Y:2002 | 06 | 2002 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $241,800 | $105,900 | Not Implemented |
CO0515 # 05 Y:2002 | 05 | 2002 | BURN WASTE OIL FOR HEAT | $34,520 | $18,000 | Not Implemented |
CO0515 # 03 Y:2002 | 03 | 2002 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $50,000 | $26,000 | Implemented |