IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

45

matching recommendations
Reset
SIC 1442 Construction Sand And Gravel
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0781 # 04 Y:2023 04 2023 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $486,797 $4,030,000 n/a
OR0781 # 03 Y:2023 03 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $618 $2,576 n/a
OR0781 # 02 Y:2023 02 2023 OPTIMIZE PLANT POWER FACTOR $3,665 $20,839 n/a
OR0781 # 01 Y:2023 01 2023 ELIMINATE/REDUCE AN OPERATION $112,997 $116,429 n/a
OR0730 # 05 Y:2019 05 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,030 $2,058 Not Implemented
OR0730 # 04 Y:2019 04 2019 OPTIMIZE PLANT POWER FACTOR $2,657 $9,364 Not Implemented
OR0730 # 03 Y:2019 03 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,201 $0 Not Implemented
OR0730 # 02 Y:2019 02 2019 MODIFY WORKLOAD $13,223 $18,824 Not Implemented
OR0730 # 01 Y:2019 01 2019 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES $15,651 $5,000 Not Implemented
SU0284 # 04 Y:2009 04 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,370 $4,766 Not Implemented
SU0284 # 03 Y:2009 03 2009 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $62,238 $73,214 Implemented
SU0284 # 02 Y:2009 02 2009 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $181 $197 Implemented
SU0284 # 01 Y:2009 01 2009 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,788 $0 Implemented
AS0379 # 02 Y:2004 02 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $771 $18 n/a
AS0379 # 01 Y:2004 01 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,855 $60 n/a
AS0379 # 06 Y:2004 06 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $882 $3,715 n/a
AS0379 # 05 Y:2004 05 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,661 $1,885 n/a
AS0379 # 04 Y:2004 04 2004 REPLACE ELECTRIC MOTOR WITH FOSSIL FUEL ENGINE $49,440 $190,300 n/a
AS0379 # 03 Y:2004 03 2004 $32,901 $159,000 n/a
SU0177 # 05 Y:2004 05 2004 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $18,711 $134,000 Not Implemented
SU0177 # 04 Y:2004 04 2004 USE SYNTHETIC LUBRICANT $1,396 $1,000 Implemented
SU0177 # 03 Y:2004 03 2004 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $319,380 $270,000 Implemented
SU0177 # 02 Y:2004 02 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $85 $0 Not Implemented
SU0177 # 01 Y:2004 01 2004 PAY UTILITY BILLS ON TIME $691 $0 Implemented
OR0445 # 01 Y:2003 01 2003 $123,700 $303,000 n/a