Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
9,751
matching recommendationsSIC | 20 | Food and Kindred Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IP0125 # 04 Y:2019 | 04 | 2019 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $908 | $1,344 | Implemented |
IP0125 # 05 Y:2019 | 05 | 2019 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $269 | $500 | Implemented |
IP0125 # 06 Y:2019 | 06 | 2019 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $3,324 | $8,560 | Implemented |
IP0125 # 07 Y:2019 | 07 | 2019 | REDUCE EXCESSIVE BOILER BLOWDOWN | $2,364 | $6,720 | Implemented |
IP0125 # 08 Y:2019 | 08 | 2019 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $133 | $390 | Implemented |
GT0930 # 01 Y:2019 | 01 | 2019 | INSTALL OCCUPANCY SENSORS | $11,220 | $2,763 | Implemented |
GT0930 # 02 Y:2019 | 02 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,062 | $3,500 | Implemented |
GT0930 # 03 Y:2019 | 03 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,531 | $8,066 | Implemented |
GT0930 # 04 Y:2019 | 04 | 2019 | TURN OFF EQUIPMENT WHEN NOT IN USE | $479 | $463 | Implemented |
GT0930 # 05 Y:2019 | 05 | 2019 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $1,746 | $1,755 | Implemented |
GT0930 # 07 Y:2019 | 07 | 2019 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,081 | $2,100 | Implemented |
GT0930 # 08 Y:2019 | 08 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,041 | $3,500 | Implemented |
GT0929 # 01 Y:2019 | 01 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $16,816 | $32,516 | Implemented |
IC0220 # 01 Y:2019 | 01 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $75,268 | $7,000 | Implemented |
IC0220 # 03 Y:2019 | 03 | 2019 | REPAIR OR REPLACE STEAM TRAPS | $17,321 | $4,875 | Implemented |
IC0220 # 06 Y:2019 | 06 | 2019 | MINIMIZE WATER USAGE | $9,210 | $11,980 | Implemented |
NL0034 # 01 Y:2019 | 01 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,764 | $8,337 | Implemented |
NL0034 # 06 Y:2019 | 06 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $238 | $500 | Implemented |
NL0034 # 07 Y:2019 | 07 | 2019 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $122 | $275 | Implemented |
MI0356 # 08 Y:2019 | 08 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,569 | $2,020 | Implemented |
MI0356 # 02 Y:2019 | 02 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $28,750 | $42,002 | Implemented |
MI0356 # 03 Y:2019 | 03 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $25,615 | $19,558 | Implemented |
MI0356 # 05 Y:2019 | 05 | 2019 | REDUCE EXCESSIVE BOILER BLOWDOWN | $10,928 | $8,500 | Implemented |
MI0356 # 06 Y:2019 | 06 | 2019 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $8,814 | $480 | Implemented |
SF0542 # 04 Y:2019 | 04 | 2019 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $12,409 | $1,384 | Implemented |