Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
9,751
matching recommendationsSIC | 20 | Food and Kindred Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AM0733 # 03 Y:2017 | 03 | 2017 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $32,880 | $15,000 | Implemented |
AM0733 # 04 Y:2017 | 04 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,370 | $10 | Implemented |
AM0733 # 05 Y:2017 | 05 | 2017 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $2,040 | $0 | Implemented |
AM0733 # 06 Y:2017 | 06 | 2017 | INSULATE BARE EQUIPMENT | $260 | $271 | Implemented |
AM0733 # 07 Y:2017 | 07 | 2017 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $5,290 | $1,720 | Implemented |
GT0899 # 02 Y:2017 | 02 | 2017 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $7,187 | $1,000 | Implemented |
GT0899 # 03 Y:2017 | 03 | 2017 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $29,097 | $4,967 | Implemented |
GT0899 # 05 Y:2017 | 05 | 2017 | INSTALL OCCUPANCY SENSORS | $8,883 | $9,708 | Implemented |
SF0502 # 01 Y:2017 | 01 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,509 | $80 | Implemented |
SF0502 # 02 Y:2017 | 02 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $379,684 | $84,889 | Implemented |
SF0502 # 03 Y:2017 | 03 | 2017 | TURN OFF EQUIPMENT WHEN NOT IN USE | $10,648 | $2,311 | Implemented |
SF0502 # 05 Y:2017 | 05 | 2017 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $21,631 | $14,971 | Implemented |
SF0502 # 06 Y:2017 | 06 | 2017 | REDESIGN PROCESS | $46,628 | $18,660 | Implemented |
SF0502 # 07 Y:2017 | 07 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $76,288 | $138,203 | Implemented |
SF0502 # 08 Y:2017 | 08 | 2017 | TURN OFF EQUIPMENT WHEN NOT IN USE | $11,335 | $14,290 | Implemented |
AM0732 # 01 Y:2017 | 01 | 2017 | TREAT AND REUSE RINSE WATERS | $19,732 | $5,800 | Implemented |
AM0732 # 02 Y:2017 | 02 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,470 | $6,750 | Implemented |
TT0190 # 06 Y:2017 | 06 | 2017 | INSULATE BARE EQUIPMENT | $88 | $200 | Implemented |
MI0309 # 01 Y:2017 | 01 | 2017 | INSTALL TIMERS AND/OR THERMOSTATS | $16,370 | $1,640 | Implemented |
MI0309 # 02 Y:2017 | 02 | 2017 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $13,394 | $34,000 | Implemented |
MI0309 # 03 Y:2017 | 03 | 2017 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $6,478 | $320 | Implemented |
MI0309 # 04 Y:2017 | 04 | 2017 | INSULATE BARE EQUIPMENT | $4,544 | $1,640 | Implemented |
MI0309 # 05 Y:2017 | 05 | 2017 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $4,389 | $1,729 | Implemented |
MI0309 # 06 Y:2017 | 06 | 2017 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $3,090 | $1,882 | Implemented |
MI0309 # 07 Y:2017 | 07 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,772 | $6,223 | Implemented |