IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,751

matching recommendations
Reset
SIC 20 Food and Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0712 # 01 Y:2013 01 2013 USE RADIANT HEATER FOR SPOT HEATING $13,420 $65,327 Implemented
MA0712 # 02 Y:2013 02 2013 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $7,863 $12,000 Implemented
MA0712 # 03 Y:2013 03 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,311 $5,000 Implemented
MA0712 # 07 Y:2013 07 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $827 $1,200 Implemented
MA0712 # 08 Y:2013 08 2013 INSULATE BARE EQUIPMENT $323 $750 Implemented
MZ0112 # 01 Y:2013 01 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,576 $14,260 Implemented
MZ0112 # 02 Y:2013 02 2013 INSTALL OCCUPANCY SENSORS $6,417 $3,000 Implemented
MZ0112 # 04 Y:2013 04 2013 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,415 $0 Implemented
MZ0112 # 05 Y:2013 05 2013 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $48,000 $2,270 Implemented
LE0357 # 02 Y:2013 02 2013 PREHEAT COMBUSTION AIR WITH WASTE HEAT $41,310 $87,100 Implemented
LE0357 # 03 Y:2013 03 2013 INSTALL TIMERS AND/OR THERMOSTATS $992 $225 Implemented
LE0357 # 05 Y:2013 05 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $29,839 $0 Implemented
LE0357 # 06 Y:2013 06 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,062 $3,910 Implemented
LE0357 # 08 Y:2013 08 2013 REPAIR AND ELIMINATE STEAM LEAKS $1,285 $4,500 Implemented
LE0357 # 09 Y:2013 09 2013 OPTIMIZE PLANT POWER FACTOR $20,522 $42,000 Implemented
LE0357 # 10 Y:2013 10 2013 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $38 $110 Implemented
AM0641 # 01 Y:2013 01 2013 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $81,000 $40,000 Implemented
AM0641 # 02 Y:2013 02 2013 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $45,620 $50,000 Implemented
AM0641 # 03 Y:2013 03 2013 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $8,894 $31,100 Implemented
AM0641 # 04 Y:2013 04 2013 INSTALL OCCUPANCY SENSORS $4,800 $1,800 Implemented
AM0641 # 05 Y:2013 05 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,130 $610 Implemented
AM0641 # 06 Y:2013 06 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $3,580 $500 Implemented
SD0471 # 06 Y:2013 06 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $31,423 $100,248 Implemented
SD0471 # 08 Y:2013 08 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $21,126 $3,300 Implemented
SD0471 # 10 Y:2013 10 2013 REPAIR AND ELIMINATE STEAM LEAKS $1,926 $200 Implemented