Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,277
matching recommendationsSIC | 20 | Food and Kindred Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SF0611 # 01 Y:2024 | 01 | 2024 | TURN OFF EQUIPMENT WHEN NOT IN USE | $14,817 | $0 | Implemented |
SF0611 # 06 Y:2024 | 06 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $165,339 | $1,651,070 | Implemented |
SF0611 # 03 Y:2024 | 03 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $61,975 | $1,800 | Implemented |
SF0611 # 02 Y:2024 | 02 | 2024 | TURN OFF EQUIPMENT WHEN NOT IN USE | $4,908 | $0 | Implemented |
SF0610 # 03 Y:2024 | 03 | 2024 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $32,003 | $15,909 | Implemented |
SF0610 # 05 Y:2024 | 05 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $31,683 | $31,050 | Implemented |
SF0610 # 06 Y:2024 | 06 | 2024 | INSTALL OCCUPANCY SENSORS | $8,502 | $10,799 | Implemented |
SF0610 # 02 Y:2024 | 02 | 2024 | REPAIR AND ELIMINATE STEAM LEAKS | $12,954 | $0 | Implemented |
SF0610 # 04 Y:2024 | 04 | 2024 | HEAT WATER WITH EXHAUST HEAT | $36,485 | $30,037 | Implemented |
SF0610 # 01 Y:2024 | 01 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $17,215 | $0 | Implemented |
SF0609 # 02 Y:2023 | 02 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,389 | $1,640 | Implemented |
SF0609 # 06 Y:2023 | 06 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $56,467 | $66,447 | Implemented |
SF0609 # 03 Y:2023 | 03 | 2023 | USE OPTIMUM THICKNESS INSULATION | $1,473 | $338 | Implemented |
SF0609 # 04 Y:2023 | 04 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,090 | $2,155 | Implemented |
SF0609 # 01 Y:2023 | 01 | 2023 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $12,048 | $1,594 | Implemented |
SF0609 # 05 Y:2023 | 05 | 2023 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $32,617 | $36,367 | Implemented |
SF0608 # 04 Y:2023 | 04 | 2023 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,050 | $0 | Implemented |
SF0608 # 02 Y:2023 | 02 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,322 | $0 | Implemented |
SF0608 # 01 Y:2023 | 01 | 2023 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $16,747 | $400 | Implemented |
SF0608 # 03 Y:2023 | 03 | 2023 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $29,842 | $690 | Implemented |
SF0608 # 08 Y:2023 | 08 | 2023 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $39,597 | $29,794 | Implemented |
SF0608 # 05 Y:2023 | 05 | 2023 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $11,235 | $4,654 | Implemented |
SF0606 # 04 Y:2023 | 04 | 2023 | INSULATE BARE EQUIPMENT | $5,279 | $5,910 | Implemented |
SF0606 # 05 Y:2023 | 05 | 2023 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $4,502 | $8,173 | Implemented |
SF0606 # 02 Y:2023 | 02 | 2023 | USE MINIMUM STEAM OPERATING PRESSURE | $5,475 | $60 | Implemented |