IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

201

matching recommendations
Reset
SIC 20 Food and Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0362 # 05 Y:1991 05 1991 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,215 $0 Implemented
OK0362 # 02 Y:1991 02 1991 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $439 $0 Implemented
OK0362 # 06 Y:1991 06 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,858 $0 Implemented
OK0362 # 01 Y:1991 01 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $191 $453 Implemented
OK0362 # 03 Y:1991 03 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $567 $0 Implemented
OK0362 # 07 Y:1991 07 1991 OPTIMIZE PLANT POWER FACTOR $7,037 $4,975 Implemented
OK0362 # 04 Y:1991 04 1991 INSULATE BARE EQUIPMENT $441 $473 Implemented
GT0447 # 01 Y:1991 01 1991 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $9,880 $500 Implemented
IA0004 # 08 Y:1991 08 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $199 $20 Implemented
IA0004 # 04 Y:1991 04 1991 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $531 $1,703 Implemented
IA0004 # 02 Y:1991 02 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,401 $2,453 Implemented
IA0004 # 01 Y:1991 01 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $559 $0 Implemented
ND0011 # 07 Y:1991 07 1991 RECOVER WASTE HEAT FROM EQUIPMENT $3,544 $700 Implemented
ND0011 # 04 Y:1991 04 1991 OPTIMIZE PLANT POWER FACTOR $11,735 $35,163 Implemented
IA0004 # 03 Y:1991 03 1991 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,523 $1,200 Implemented
GT0447 # 02 Y:1991 02 1991 INSULATE BARE EQUIPMENT $534 $1,330 Implemented
GT0447 # 03 Y:1991 03 1991 REPAIR AND ELIMINATE STEAM LEAKS $754 $150 Implemented
GT0447 # 05 Y:1991 05 1991 HEAT WATER WITH EXHAUST HEAT $60,730 $125,000 Implemented
ND0011 # 08 Y:1991 08 1991 REPAIR OR REPLACE STEAM TRAPS $146 $250 Implemented
IA0006 # 06 Y:1991 06 1991 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $721 $945 Implemented
IA0006 # 04 Y:1991 04 1991 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $286 $395 Implemented
IA0006 # 03 Y:1991 03 1991 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $1,884 $6,800 Implemented
WI0133 # 08 Y:1991 08 1991 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $91 $236 Implemented
IA0006 # 05 Y:1991 05 1991 RECOVER AND REUSE COOLING WATER $3,302 $0 Implemented
IA0004 # 07 Y:1991 07 1991 RECOVER WASTE HEAT FROM EQUIPMENT $827 $686 Implemented