IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

975

matching recommendations
Reset
SIC 20 Food and Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0495 # 04 Y:2001 04 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $250 $0 Implemented
CO0495 # 05 Y:2001 05 2001 REUSE / RECYCLE/ SELL PAPER PRODUCTS $9,900 $1,000 Implemented
CO0483 # 01 Y:2001 01 2001 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,160 $0 Implemented
CO0483 # 02 Y:2001 02 2001 USE DEMAND CONTROLLER OR LOAD SHEDDER $500 $1,000 Not Implemented
CO0483 # 03 Y:2001 03 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $90 $0 Implemented
CO0483 # 04 Y:2001 04 2001 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $4,810 $4,730 Implemented
CO0483 # 05 Y:2001 05 2001 SELL / OFFER BY-PRODUCT AS ANIMAL FEED $1,930 $1,930 Not Implemented
CO0469 # 01 Y:2000 01 2000 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $3,000 $9,500 Implemented
CO0469 # 02 Y:2000 02 2000 RECOVER WASTE HEAT FROM EQUIPMENT $860 $2,270 Not Implemented
CO0469 # 03 Y:2000 03 2000 INSULATE BARE EQUIPMENT $590 $1,510 Implemented
CO0469 # 04 Y:2000 04 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $350 $0 Implemented
CO0469 # 05 Y:2000 05 2000 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $730 $50 Implemented
CO0469 # 06 Y:2000 06 2000 AUTOMATE FINISHING PROCESS $27,300 $20,000 Not Implemented
CO0469 # 07 Y:2000 07 2000 INSTALL AUTOMATIC PACKING EQUIPMENT $22,100 $9,000 Implemented
CO0469 # 08 Y:2000 08 2000 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $2,080 $1,200 Implemented
CO0446 # 01 Y:1999 01 1999 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $16,050 $60,000 Not Implemented
CO0446 # 02 Y:1999 02 1999 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $1,500 $9,500 Not Implemented
CO0446 # 03 Y:1999 03 1999 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $400 $1,000 Implemented
CO0446 # 04 Y:1999 04 1999 TURN OFF EQUIPMENT WHEN NOT IN USE $350 $110 Not Implemented
CO0446 # 05 Y:1999 05 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $90 $0 Implemented
CO0446 # 06 Y:1999 06 1999 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $530 $0 Implemented
CO0446 # 07 Y:1999 07 1999 INSTALL AUTOMATIC PACKING EQUIPMENT $839,300 $1,020,000 Not Implemented
CO0404 # 01 Y:1997 01 1997 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $7,800 $5,000 Implemented
CO0404 # 02 Y:1997 02 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,420 $280 Implemented
CO0404 # 03 Y:1997 03 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $365 $498 Implemented