IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

968

matching recommendations
Reset
SIC 20 Food and Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DS0067 # 05 Y:1996 05 1996 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $7,027 $2,390 Implemented
DS0067 # 06 Y:1996 06 1996 RECOVER AND REUSE WASTE MATERIAL $773 $900 Not Implemented
AS0190 # 01 Y:1996 01 1996 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,769 $100 Implemented
AS0190 # 02 Y:1996 02 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,298 $440 Implemented
AS0190 # 03 Y:1996 03 1996 INSTALL OCCUPANCY SENSORS $2,310 $2,025 Implemented
AS0190 # 04 Y:1996 04 1996 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $5,913 $5,700 Implemented
AS0190 # 05 Y:1996 05 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,052 $2,348 Not Implemented
AS0190 # 06 Y:1996 06 1996 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $190,648 $100,000 Implemented
AS0190 # 07 Y:1996 07 1996 USE SYNTHETIC LUBRICANT $3,954 $1,150 Not Implemented
AS0190 # 08 Y:1996 08 1996 MINIMIZE WATER USAGE $10,501 $200 Implemented
TN0596 # 01 Y:1996 01 1996 REDESIGN PROCESS $97,310 $38,900 Not Implemented
TN0596 # 02 Y:1996 02 1996 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $80,150 $1,130 Implemented
TN0596 # 03 Y:1996 03 1996 RECOVER WASTE HEAT FROM EQUIPMENT $40,800 $99,260 Not Implemented
TN0596 # 04 Y:1996 04 1996 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $37,300 $61,100 Not Implemented
TN0596 # 05 Y:1996 05 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,870 $4,200 Implemented
TN0596 # 06 Y:1996 06 1996 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,170 $7,000 Implemented
TN0596 # 07 Y:1996 07 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $580 $410 Implemented
UF0161 # 01 Y:1996 01 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,316 $7,288 Not Implemented
UF0161 # 02 Y:1996 02 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $491 $6,951 Implemented
UF0161 # 03 Y:1996 03 1996 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $546 $500 Not Implemented
UF0161 # 04 Y:1996 04 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,132 $1,000 Implemented
UF0161 # 05 Y:1996 05 1996 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $8,171 $7,500 Not Implemented
UF0161 # 06 Y:1996 06 1996 TREAT AND REUSE RINSE WATERS $816 $865 Not Implemented
UF0161 # 07 Y:1996 07 1996 $11,375 $7,000 Implemented
DS0065 # 01 Y:1996 01 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $616 $11,156 Implemented