IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

575

matching recommendations
Reset
SIC 20 Food and Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
ME0250 # 11 Y:1998 11 1998 INSULATE BARE EQUIPMENT $427 $0 Implemented
UF0204 # 01 Y:1998 01 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,991 $5,652 Implemented
UF0204 # 02 Y:1998 02 1998 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,088 $792 Not Implemented
UF0204 # 03 Y:1998 03 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,777 $4,604 Not Implemented
UF0204 # 04 Y:1998 04 1998 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $980 $1,000 Implemented
UF0204 # 05 Y:1998 05 1998 USE DIRECT FLAME IMPINGEMENT OR INFRARED PROCESSING FOR CHAMBER TYPE HEATING $46,067 $116,000 Implemented
UF0204 # 06 Y:1998 06 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $16,919 $1,200 Implemented
UF0204 # 07 Y:1998 07 1998 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $1,380 $0 Not Implemented
UF0204 # 08 Y:1998 08 1998 ELIMINATE PRACTICE OF MIXING WASTE STREAMS $28,601 $2,500 Not Implemented
UF0204 # 09 Y:1998 09 1998 $3,000 $4,000 Not Implemented
SF0143 # 01 Y:1998 01 1998 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $3,365 $0 Implemented
SF0143 # 02 Y:1998 02 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,986 $0 Implemented
SF0143 # 03 Y:1998 03 1998 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $367 $0 Implemented
SF0143 # 04 Y:1998 04 1998 USE PHOTOCELL CONTROLS $6,026 $2,250 Implemented
SF0143 # 05 Y:1998 05 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,067 $4,684 Implemented
SF0143 # 06 Y:1998 06 1998 CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS $78,251 $99,600 Implemented
SF0143 # 07 Y:1998 07 1998 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $5,701 $9,000 Implemented
SF0143 # 08 Y:1998 08 1998 INSULATE BARE EQUIPMENT $468 $1,138 Implemented
SF0143 # 09 Y:1998 09 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,201 $34,990 Not Implemented
SF0143 # 10 Y:1998 10 1998 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $687 $2,174 Not Implemented
UL0195 # 01 Y:1998 01 1998 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,850 $20 Not Implemented
UL0195 # 02 Y:1998 02 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,732 $260 Not Implemented
UL0195 # 03 Y:1998 03 1998 INSTALL TIMERS AND/OR THERMOSTATS $6,368 $800 Not Implemented
UL0195 # 04 Y:1998 04 1998 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE $2,628 $0 Implemented
UL0195 # 05 Y:1998 05 1998 UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS $6,458,418 $3,180,000 Not Implemented