IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

784

matching recommendations
Reset
SIC 20 Food and Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0127 # 07 Y:2007 07 2007 INSULATE BARE EQUIPMENT $3,818 $886 Implemented
IC0127 # 08 Y:2007 08 2007 REPAIR AND ELIMINATE STEAM LEAKS $2,137 $1,000 Implemented
IC0127 # 09 Y:2007 09 2007 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $9,282 $0 Implemented
IC0127 # 10 Y:2007 10 2007 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS $22,675 $50,711 Implemented
IC0121 # 01 Y:2006 01 2006 INSTALL / REPAIR INSULATION ON STEAM LINES $17,152 $4,984 Implemented
IC0121 # 02 Y:2006 02 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,664 $700 Implemented
IC0121 # 03 Y:2006 03 2006 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $8,928 $9,302 Not Implemented
IC0121 # 04 Y:2006 04 2006 INSTALL TURBULATORS $7,715 $23,253 Not Implemented
IC0121 # 05 Y:2006 05 2006 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $20,185 $115,000 Not Implemented
IC0121 # 06 Y:2006 06 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $440 $1,664 Implemented
IC0121 # 07 Y:2006 07 2006 INCREASE AMOUNT OF CONDENSATE RETURNED $18,627 $88,113 Not Implemented
IC0121 # 08 Y:2006 08 2006 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,394 $27,491 Implemented
IC0121 # 09 Y:2006 09 2006 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $7,933 $89,400 Not Implemented
BD0286 # 01 Y:2005 01 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $140,820 $28,500 Implemented
BD0286 # 02 Y:2005 02 2005 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $94,025 $122,830 Implemented
BD0286 # 03 Y:2005 03 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $40,515 $5,400 Not Implemented
BD0286 # 04 Y:2005 04 2005 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $18,974 $14,000 Implemented
BD0286 # 05 Y:2005 05 2005 INSTALL OCCUPANCY SENSORS $9,987 $2,625 Implemented
BD0286 # 06 Y:2005 06 2005 INSTALL TURBULATORS $8,810 $12,000 Implemented
BD0286 # 07 Y:2005 07 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,152 $1,200 Implemented
BD0286 # 08 Y:2005 08 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,506 $0 Implemented
BD0286 # 09 Y:2005 09 2005 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,512 $400 Not Implemented
BD0286 # 10 Y:2005 10 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $472 $596 Not Implemented
BD0286 # 11 Y:2005 11 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $464 $350 Implemented
BD0286 # 12 Y:2005 12 2005 USE EVAPORATION TO CONCENTRATE MATERIAL $88,374 $20,512 Not Implemented