IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

533

matching recommendations
Reset
SIC 20 Food and Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0446 # 06 Y:2014 06 2014 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $11,000 $4,000 Not Implemented
TT0129 # 01 Y:2014 01 2014 RECOVER WASTE HEAT FROM EQUIPMENT $107,559 $235,000 Not Implemented
TT0129 # 02 Y:2014 02 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,620 $2,025 Not Implemented
TT0129 # 03 Y:2014 03 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,827 $3,000 Not Implemented
TT0129 # 04 Y:2014 04 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,882 $3,000 Implemented
OR0629 # 01 Y:2014 01 2014 REDESIGN FLOW TO MINIMIZE MASS TRANSFER LENGTH $37,907 $21,000 Implemented
OR0629 # 02 Y:2014 02 2014 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $37,863 $38,930 Not Implemented
OR0629 # 03 Y:2014 03 2014 RECOVER AND REUSE COOLING WATER $58,681 $3,764 Implemented
OR0629 # 04 Y:2014 04 2014 REPLACE BOILER $523,306 $3,403,664 Implemented
TT0138 # 01 Y:2014 01 2014 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $442 $0 Not Implemented
TT0138 # 02 Y:2014 02 2014 DISCONNECT BALLASTS $76 $0 Not Implemented
TT0138 # 03 Y:2014 03 2014 UPGRADE CONTROLS ON COMPRESSORS $3,131 $800 Implemented
TT0138 # 04 Y:2014 04 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $899 $300 Implemented
TT0138 # 05 Y:2014 05 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $88 $90 Implemented
TT0138 # 06 Y:2014 06 2014 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $354 $500 Implemented
TT0138 # 07 Y:2014 07 2014 OPTIMIZE PLANT POWER FACTOR $6,063 $18,225 Implemented
TT0138 # 08 Y:2014 08 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,143 $8,000 Not Implemented
UD0903 # 01 Y:2014 01 2014 COMBINE UTILITY METERS $4,811 $0 Implemented
UD0903 # 02 Y:2014 02 2014 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,853 $0 Implemented
UD0903 # 03 Y:2014 03 2014 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $847 $0 Implemented
UD0903 # 04 Y:2014 04 2014 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $137 $0 Not Implemented
UD0903 # 05 Y:2014 05 2014 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $9,617 $500 Not Implemented
UD0903 # 06 Y:2014 06 2014 INSTALL OCCUPANCY SENSORS $4,126 $500 Implemented
UD0903 # 07 Y:2014 07 2014 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,363 $350 Not Implemented
UD0903 # 08 Y:2014 08 2014 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,194 $350 Not Implemented