IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

426

matching recommendations
Reset
SIC 20 Food and Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0262 # 04 Y:2008 04 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,275 $392 Not Implemented
SU0262 # 05 Y:2008 05 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,882 $5,215 Implemented
SU0262 # 06 Y:2008 06 2008 INSTALL / REPAIR INSULATION ON STEAM LINES $338 $577 Not Implemented
SU0262 # 07 Y:2008 07 2008 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $183 $308 Not Implemented
SU0262 # 08 Y:2008 08 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,400 $10,328 Implemented
SU0262 # 09 Y:2008 09 2008 INSTALL OCCUPANCY SENSORS $320 $716 Not Implemented
LE0267 # 01 Y:2008 01 2008 $198,263 $200,000 Not Implemented
LE0267 # 02 Y:2008 02 2008 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $41,140 $6,000 Implemented
LE0267 # 03 Y:2008 03 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $36,169 $30,000 Implemented
LE0267 # 04 Y:2008 04 2008 REPAIR OR REPLACE STEAM TRAPS $31,944 $2,000 Implemented
LE0267 # 05 Y:2008 05 2008 PREHEAT COMBUSTION AIR WITH WASTE HEAT $21,795 $30,000 Not Implemented
LE0267 # 06 Y:2008 06 2008 CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS $26,495 $31,435 Not Implemented
LE0267 # 07 Y:2008 07 2008 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $9,200 $3,000 Implemented
LE0267 # 08 Y:2008 08 2008 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $8,134 $1,500 Not Implemented
LE0267 # 09 Y:2008 09 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,723 $1,000 Implemented
LE0267 # 10 Y:2008 10 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,129 $300,000 Implemented
BD0336 # 01 Y:2008 01 2008 RECOVER WASTE HEAT FROM EQUIPMENT $106 $151 Not Implemented
BD0336 # 02 Y:2008 02 2008 UPGRADE OBSOLETE EQUIPMENT $226 $2 Not Implemented
BD0336 # 03 Y:2008 03 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $95 $151 Not Implemented
BD0336 # 04 Y:2008 04 2008 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $948 $1,001 Not Implemented
BD0336 # 05 Y:2008 05 2008 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $1,096 $2,501 Not Implemented
BD0336 # 06 Y:2008 06 2008 INSTALL TURBULATORS $2,117 $2,501 Not Implemented
BD0336 # 07 Y:2008 07 2008 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $558 $151 Implemented
BD0336 # 08 Y:2008 08 2008 REUSE / RECYCLE/ SELL PAPER PRODUCTS $1,960 $2 Not Implemented
UF0407 # 01 Y:2008 01 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $72,878 $27,259 Not Implemented