IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

20,706

matching recommendations
Reset
SIC 20 Food and Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0471 # 05 Y:2011 05 2011 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $465 $3,000 Implemented
IA0471 # 06 Y:2011 06 2011 UTILIZE A LESS EXPENSIVE COOLING METHOD $1,974 $1,500 Implemented
LL0356 # 01 Y:2011 01 2011 INCREASE AMOUNT OF CONDENSATE RETURNED $35,965 $89,664 Implemented
LL0356 # 02 Y:2011 02 2011 INSULATE BARE EQUIPMENT $9,420 $840 Implemented
LL0356 # 03 Y:2011 03 2011 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $8,884 $30,300 Not Implemented
LL0356 # 04 Y:2011 04 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,032 $30 Not Implemented
LL0356 # 05 Y:2011 05 2011 INSULATE BARE EQUIPMENT $6,412 $1,127 Implemented
LL0356 # 06 Y:2011 06 2011 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $5,817 $1,291 Not Implemented
LL0356 # 07 Y:2011 07 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,939 $5,460 Not Implemented
LL0356 # 08 Y:2011 08 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,666 $360 Implemented
LL0356 # 09 Y:2011 09 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $717 $455 Not Implemented
LL0356 # 10 Y:2011 10 2011 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $261 $375 Not Implemented
LL0356 # 11 Y:2011 11 2011 INSTALL OCCUPANCY SENSORS $256 $480 Not Implemented
LL0356 # 12 Y:2011 12 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $158 $65 Not Implemented
LL0356 # 13 Y:2011 13 2011 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $80 $66 Implemented
AM0601 # 01 Y:2011 01 2011 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $14,600 $500 Not Implemented
AM0601 # 02 Y:2011 02 2011 USE MAGNETIC TECHNOLOGY TO TREAT WATER $4,500 $3,090 Not Implemented
AM0601 # 03 Y:2011 03 2011 USE DEMAND CONTROLLER OR LOAD SHEDDER $3,800 $0 Not Implemented
AM0601 # 04 Y:2011 04 2011 OPTIMIZE PLANT POWER FACTOR $2,515 $14,910 Not Implemented
AM0601 # 05 Y:2011 05 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,180 $500 Not Implemented
AM0601 # 06 Y:2011 06 2011 INSULATE BARE EQUIPMENT $2,020 $1,360 Not Implemented
AM0601 # 07 Y:2011 07 2011 PERFORM HIGH CONSISTENCY GAS PHASE CHLORINATION $1,960 $575 Not Implemented
AM0601 # 08 Y:2011 08 2011 INSTALL OCCUPANCY SENSORS $1,900 $5,360 Not Implemented
AM0601 # 09 Y:2011 09 2011 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $6,880 $1,500 Not Implemented
AM0601 # 10 Y:2011 10 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $775 $1,220 Not Implemented