IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

20,785

matching recommendations
Reset
SIC 20 Food and Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0226 # 05 Y:2023 05 2023 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $4,421 $3,000 Not Implemented
DL0226 # 06 Y:2023 06 2023 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $12,451 $0 Implemented
DL0226 # 07 Y:2023 07 2023 REDUCE VENTILATION AIR $1,643 $57 Implemented
DL0226 # 08 Y:2023 08 2023 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $6,284 $3,000 Not Implemented
DL0226 # 09 Y:2023 09 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,355 $9,585 Implemented
DL0226 # 10 Y:2023 10 2023 CONVERT FROM INDIRECT TO DIRECT FIRED SYSTEMS $56,102 $91,218 Implemented
LE0554 # 01 Y:2023 01 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $30,649 $26,194 Implemented
LE0554 # 02 Y:2023 02 2023 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $2,747 $5,000 Implemented
LE0554 # 03 Y:2023 03 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,873 $35,440 Implemented
LE0554 # 04 Y:2023 04 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $13,979 $40,491 Implemented
LE0554 # 05 Y:2023 05 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,367 $4,000 Implemented
LE0554 # 06 Y:2023 06 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $873 $2,700 Implemented
LE0554 # 07 Y:2023 07 2023 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $31,394 $144,000 Not Implemented
LE0554 # 08 Y:2023 08 2023 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $10,658 $49,017 Not Implemented
LE0554 # 09 Y:2023 09 2023 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $193,840 $880,000 Not Implemented
LE0554 # 10 Y:2023 10 2023 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $18,296 $86,535 Implemented
LE0554 # 11 Y:2023 11 2023 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $44,665 $369,354 Not Implemented
NL0087 # 01 Y:2023 01 2023 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $491,419 $1,990,800 n/a
NL0087 # 02 Y:2023 02 2023 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $254,315 $454,461 n/a
NL0087 # 03 Y:2023 03 2023 REPAIR OR REPLACE STEAM TRAPS $17,666 $50 n/a
NL0087 # 04 Y:2023 04 2023 USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS $12,625 $8,000 n/a
NL0087 # 05 Y:2023 05 2023 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $11,616 $7,640 n/a
NL0087 # 06 Y:2023 06 2023 RECOVER AND REUSE WASTE MATERIAL $10,817 $3,660 n/a
NL0087 # 07 Y:2023 07 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,789 $100 n/a
NL0087 # 08 Y:2023 08 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,019 $768 n/a