IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

20,706

matching recommendations
Reset
SIC 20 Food and Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0212 # 02 Y:1998 02 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $279 $372 Implemented
IA0212 # 03 Y:1998 03 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $37 $108 Implemented
IA0212 # 04 Y:1998 04 1998 ELIMINATE/REDUCE REDUNDANT INSPECTIONS $199,680 $35,485 Implemented
IA0212 # 05 Y:1998 05 1998 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $59,520 $111,000 Implemented
IA0212 # 06 Y:1998 06 1998 ELIMINATE/REDUCE AN OPERATION $24,960 $20,000 Implemented
IA0212 # 07 Y:1998 07 1998 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $1,746 $75 Implemented
OR0338 # 01 Y:1999 01 1999 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES $14,000 $1,630 Implemented
OR0338 # 02 Y:1999 02 1999 INSTALL AUTOMATIC PACKING EQUIPMENT $229,748 $79,349 Not Implemented
OR0338 # 03 Y:1999 03 1999 INSTALL AUTOMATIC PACKING EQUIPMENT $6,574 $15,045 Not Implemented
OR0338 # 04 Y:1999 04 1999 INSULATE BARE EQUIPMENT $9,244 $1,831 Not Implemented
OR0338 # 05 Y:1999 05 1999 RECOVER WASTE HEAT FROM EQUIPMENT $11,400 $12,250 Not Implemented
OR0338 # 06 Y:1999 06 1999 USE OPTIMUM THICKNESS INSULATION $1,900 $1,810 Not Implemented
OD0124 # 01 Y:1998 01 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,935 $6,012 Implemented
OD0124 # 02 Y:1998 02 1998 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS $437 $1,290 Not Implemented
OD0124 # 03 Y:1998 03 1998 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,225 $5,625 Not Implemented
OD0124 # 04 Y:1998 04 1998 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $7,805 $4,595 Not Implemented
SF0154 # 01 Y:1998 01 1998 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $3,242 $0 Implemented
SF0154 # 02 Y:1998 02 1998 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $112,256 $73,966 Not Implemented
SF0154 # 03 Y:1998 03 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,646 $4,900 Implemented
SF0154 # 04 Y:1998 04 1998 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $15,577 $17,000 Not Implemented
SF0154 # 05 Y:1998 05 1998 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,270 $17,928 Not Implemented
SF0154 # 06 Y:1998 06 1998 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,837 $5,310 Not Implemented
SF0154 # 07 Y:1998 07 1998 INCREASE AMOUNT OF CONDENSATE RETURNED $3,288 $6,477 Not Implemented
SF0154 # 08 Y:1998 08 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,681 $9,290 Implemented
SF0154 # 09 Y:1998 09 1998 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,664 $4,281 Implemented