Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,034
matching recommendationsSIC | 20 | Food and Kindred Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0656 # 01 Y:2015 | 01 | 2015 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $2,308,919 | $1,300,000 | Implemented |
OR0656 # 02 Y:2015 | 02 | 2015 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $188,688 | $247,000 | Implemented |
OR0656 # 03 Y:2015 | 03 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $17,591 | $27,789 | Implemented |
OR0656 # 04 Y:2015 | 04 | 2015 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $317,386 | $0 | Not Implemented |
OR0656 # 05 Y:2015 | 05 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $7,282 | $22,500 | Implemented |
OR0653 # 01 Y:2015 | 01 | 2015 | INCREASE AMOUNT OF CONDENSATE RETURNED | $118,419 | $40,792 | Not Implemented |
OR0653 # 02 Y:2015 | 02 | 2015 | FLASH CONDENSATE TO PRODUCE LOWER PRESSURE STEAM | $36,536 | $30,728 | Not Implemented |
OR0653 # 03 Y:2015 | 03 | 2015 | USE OPTIMUM THICKNESS INSULATION | $3,897 | $4,580 | Not Implemented |
OR0653 # 04 Y:2015 | 04 | 2015 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $611 | $1,058 | Not Implemented |
OR0653 # 05 Y:2015 | 05 | 2015 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $4,262 | $15,398 | Not Implemented |
OR0653 # 06 Y:2015 | 06 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,625 | $1,000 | Not Implemented |
OR0652 # 01 Y:2015 | 01 | 2015 | REPLACE PURCHASED STEAM WITH OTHER ENERGY SOURCE | $7,000 | $54,000 | Not Implemented |
OR0652 # 02 Y:2015 | 02 | 2015 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $2,010 | $2,900 | Not Implemented |
OR0652 # 03 Y:2015 | 03 | 2015 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $2,990 | $0 | Not Implemented |
OR0652 # 04 Y:2015 | 04 | 2015 | USE SOLAR HEAT TO MAKE ELECTRICTY | $6,390 | $51,745 | Not Implemented |
OR0652 # 05 Y:2015 | 05 | 2015 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $5,000 | $15,000 | Not Implemented |
OR0647 # 01 Y:2015 | 01 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,826 | $4,986 | Implemented |
OR0647 # 02 Y:2015 | 02 | 2015 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $8,293 | $800 | Not Implemented |
OR0647 # 03 Y:2015 | 03 | 2015 | IMPROVE COMBUSTION CONTROL CAPABILITY | $8,286 | $7,123 | Not Implemented |
OR0647 # 04 Y:2015 | 04 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $24,576 | $25,575 | Implemented |
OR0641 # 01 Y:2014 | 01 | 2014 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $17,076 | $2,794 | Implemented |
OR0641 # 02 Y:2014 | 02 | 2014 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $13,580 | $8,760 | Implemented |
OR0641 # 03 Y:2014 | 03 | 2014 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $5,509 | $8,500 | Not Implemented |
OR0641 # 04 Y:2014 | 04 | 2014 | INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS | $1,470 | $1,577 | Implemented |
OR0641 # 05 Y:2014 | 05 | 2014 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $581 | $1,121 | Implemented |