IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

227

matching recommendations
Reset
SIC 20 Food and Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0231 # 05 Y:2003 05 2003 REPLACE BOILER $6,310 $2,500 Not Implemented
ND0322 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $639 $1,458 Not Implemented
ND0322 # 02 Y:1999 02 1999 USE OPTIMUM TEMPERATURE $161 $0 Implemented
ND0322 # 03 Y:1999 03 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,357 $1,250 Not Implemented
ND0322 # 04 Y:1999 04 1999 PURCHASE RE-CONDITIONED MATERIAL INSTEAD OF NEW $2,056 $38,197 Not Implemented
ND0322 # 05 Y:1999 05 1999 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $10,625 $4,000 Not Implemented
ND0322 # 06 Y:1999 06 1999 CONVERT TO AQUEOUS CLEANING SYSTEM $65 $20 Not Implemented
UM0097 # 01 Y:1997 01 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,449 $4,445 Implemented
UM0097 # 02 Y:1997 02 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,340 $1,500 Implemented
UM0097 # 03 Y:1997 03 1997 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $4,254 $2,400 Not Implemented
UM0097 # 04 Y:1997 04 1997 MINIMIZE WATER USAGE $915 $0 Not Implemented
UM0097 # 05 Y:1997 05 1997 INSTALL AUTOMATIC PACKING EQUIPMENT $187,572 $28,169 Implemented
UM0092 # 01 Y:1997 01 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,141 $4,497 Not Implemented
UM0092 # 02 Y:1997 02 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,616 $29,553 Not Implemented
UM0092 # 03 Y:1997 03 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $696 $1,000 Not Implemented
UM0092 # 04 Y:1997 04 1997 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $35,249 $8,500 Not Implemented
UM0092 # 05 Y:1997 05 1997 INSULATE BARE EQUIPMENT $1,392 $5,361 Not Implemented
UM0092 # 06 Y:1997 06 1997 USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME $245,000 $10,000 Not Implemented
UM0092 # 07 Y:1997 07 1997 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $4,512 $300 Not Implemented
UM0082 # 01 Y:1997 01 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,892 $5,190 Implemented
UM0082 # 02 Y:1997 02 1997 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $5,427 $3,920 Not Implemented
UM0082 # 03 Y:1997 03 1997 RECOVER WASTE HEAT FROM EQUIPMENT $5,039 $6,000 Not Implemented
UM0082 # 04 Y:1997 04 1997 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $1,353 $3,800 Not Implemented
UM0082 # 05 Y:1997 05 1997 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $115,000 $2,400 Implemented
UM0052 # 01 Y:1996 01 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,306 $1,433 Implemented