IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

285

matching recommendations
Reset
SIC 20 Food and Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0835 # 05 Y:2022 05 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,360 $625 Not Implemented
MA0835 # 04 Y:2022 04 2022 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $680 $750 Implemented
MA0835 # 03 Y:2022 03 2022 RECOVER WASTE HEAT FROM EQUIPMENT $18,072 $14,280 Not Implemented
MA0835 # 02 Y:2022 02 2022 USE HEAT PUMP FOR SPACE CONDITIONING $2,773 $7,150 Implemented
MA0835 # 01 Y:2022 01 2022 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $10,572 $40,722 Implemented
MA0836 # 08 Y:2022 08 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,781 $625 Implemented
MA0836 # 07 Y:2022 07 2022 USE HEAT PUMP FOR SPACE CONDITIONING $2,777 $7,150 Implemented
MA0836 # 06 Y:2022 06 2022 LIMIT AND CONTROL SECONDARY COMBUSTION AIR IN FURNACE $7,372 $500 Implemented
MA0836 # 05 Y:2022 05 2022 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,531 $1,500 Implemented
MA0836 # 04 Y:2022 04 2022 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $6,264 $875 Not Implemented
MA0836 # 03 Y:2022 03 2022 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $9,895 $23,950 Implemented
MA0836 # 02 Y:2022 02 2022 RECOVER WASTE HEAT FROM EQUIPMENT $9,598 $34,642 Not Implemented
MA0836 # 01 Y:2022 01 2022 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $16,115 $39,510 Not Implemented
ME0304 # 03 Y:2000 03 2000 INSTALL / REPAIR INSULATION ON STEAM LINES $152 $384 Not Implemented
ME0304 # 02 Y:2000 02 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,300 $3,542 Not Implemented
ME0304 # 01 Y:2000 01 2000 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,601 $3,600 Not Implemented
ME0304 # 05 Y:2000 05 2000 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $29,835 $4,434 Implemented
ME0304 # 04 Y:2000 04 2000 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $1,848 $0 Implemented
ME0299 # 10 Y:2000 10 2000 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $197 $240 Not Implemented
ME0299 # 05 Y:2000 05 2000 COMBINE UTILITY METERS $1,333 $3,910 Not Implemented
ME0299 # 04 Y:2000 04 2000 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $1,337 $2,440 Not Implemented
ME0299 # 11 Y:2000 11 2000 CONDENSE OPERATION INTO ONE BUILDING $7,500 $6,043 Not Implemented
ME0299 # 09 Y:2000 09 2000 IMPROVED MATERIAL HANDLING (MIXING AND TRANSFER) $87,478 $8,500 Not Implemented
ME0299 # 02 Y:2000 02 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,184 $14,916 Not Implemented
ME0299 # 07 Y:2000 07 2000 PAY UTILITY BILLS ON TIME $484 $0 Not Implemented