Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
825
matching recommendationsSIC | 20 | Food and Kindred Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK1104 # 01 Y:2024 | 01 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $89 | $0 | Not Implemented |
OK1104 # 04 Y:2024 | 04 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $179 | $580 | Not Implemented |
OK1104 # 02 Y:2024 | 02 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,987 | $1,552 | Not Implemented |
OK1104 # 03 Y:2024 | 03 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $14,088 | $189,810 | Not Implemented |
OK1072 # 05 Y:2022 | 05 | 2022 | USE SOLAR HEAT TO MAKE ELECTRICTY | $265,528 | $1,357,737 | Not Implemented |
OK1072 # 03 Y:2022 | 03 | 2022 | OPTIMIZE PLANT POWER FACTOR | $439 | $2,000 | Not Implemented |
OK1072 # 02 Y:2022 | 02 | 2022 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $6,749 | $0 | Not Implemented |
OK1072 # 04 Y:2022 | 04 | 2022 | INSTALL SUB-METERING EQUIPMENT | $173,223 | $1,272 | Not Implemented |
OK1072 # 01 Y:2022 | 01 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,650 | $0 | Implemented |
OK1047 # 03 Y:2021 | 03 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,212 | $1,242 | Implemented |
OK1047 # 04 Y:2021 | 04 | 2021 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $876 | $500 | Implemented |
OK1047 # 02 Y:2021 | 02 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,774 | $6,045 | Implemented |
OK1047 # 01 Y:2021 | 01 | 2021 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $9,181 | $17,737 | Implemented |
OK1044 # 03 Y:2021 | 03 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,702 | $14,800 | Implemented |
OK1044 # 01 Y:2021 | 01 | 2021 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,137 | $0 | Not Implemented |
OK1044 # 02 Y:2021 | 02 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,516 | $3,266 | Not Implemented |
OK1044 # 04 Y:2021 | 04 | 2021 | OPTIMIZE PLANT POWER FACTOR | $3,229 | $11,200 | Not Implemented |
OK1021 # 03 Y:2019 | 03 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,570 | $850 | Implemented |
OK1021 # 04 Y:2019 | 04 | 2019 | INSTALL / REPAIR INSULATION ON STEAM LINES | $6,865 | $426 | Implemented |
OK1021 # 02 Y:2019 | 02 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,490 | $4,312 | Implemented |
OK1021 # 05 Y:2019 | 05 | 2019 | INSTALL SUB-METERING EQUIPMENT | $5,665 | $887 | Not Implemented |
OK1021 # 01 Y:2019 | 01 | 2019 | CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS | $957 | $524 | Implemented |
OK1016 # 01 Y:2019 | 01 | 2019 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $27,210 | $730 | Not Implemented |
OK1016 # 04 Y:2019 | 04 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,330 | $0 | Implemented |
OK1016 # 06 Y:2019 | 06 | 2019 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $885 | $4,860 | Not Implemented |