Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
86
matching recommendationsSIC | 20 | Food and Kindred Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UU0223 # 01 Y:2023 | 01 | 2023 | ELIMINATE SHIFT | $171,281 | $5,500 | Implemented |
UU0223 # 02 Y:2023 | 02 | 2023 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $16,735 | $51,600 | Implemented |
UU0223 # 05 Y:2023 | 05 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $277 | $142 | Implemented |
UU0223 # 03 Y:2023 | 03 | 2023 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $8,766 | $26,767 | Implemented |
UU0223 # 04 Y:2023 | 04 | 2023 | INCREASE AMOUNT OF CONDENSATE RETURNED | $3,305 | $11,743 | Implemented |
UU0217 # 03 Y:2023 | 03 | 2023 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $4,807 | $8,910 | Implemented |
UU0217 # 01 Y:2023 | 01 | 2023 | Install Anaerobic Digester | $648,030 | $7,400,000 | Implemented |
UU0217 # 02 Y:2023 | 02 | 2023 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $9,500 | $51,330 | Implemented |
UU0217 # 04 Y:2023 | 04 | 2023 | UPGRADE CONTROLS ON COMPRESSORS | $2,013 | $1,020 | Implemented |
UU0187 # 03 Y:2021 | 03 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $735 | $1,470 | Implemented |
UU0180 # 04 Y:2021 | 04 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,073 | $13,873 | Implemented |
UU0180 # 03 Y:2021 | 03 | 2021 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $7,182 | $4,000 | Implemented |
UU0180 # 09 Y:2021 | 09 | 2021 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $323 | $227 | Implemented |
UU0180 # 06 Y:2021 | 06 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $776 | $126 | Implemented |
UU0179 # 05 Y:2021 | 05 | 2021 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,131 | $100 | Implemented |
UU0179 # 02 Y:2021 | 02 | 2021 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $27,935 | $2,000 | Implemented |
UU0179 # 06 Y:2021 | 06 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,013 | $6,614 | Implemented |
UU0161 # 01 Y:2020 | 01 | 2020 | MINIMIZE CONTAMINATION OF WATER BEFORE TREATMENT | $43,260 | $86,000 | Implemented |
UU0161 # 02 Y:2020 | 02 | 2020 | INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE | $22,840 | $53,000 | Implemented |
UU0161 # 06 Y:2020 | 06 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,780 | $6,880 | Implemented |
UU0161 # 03 Y:2020 | 03 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $8,315 | $7,880 | Implemented |
UU0160 # 01 Y:2020 | 01 | 2020 | INCREASE AMOUNT OF CONDENSATE RETURNED | $47,740 | $212,490 | Implemented |
UU0160 # 05 Y:2020 | 05 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,220 | $23,540 | Implemented |
UU0160 # 02 Y:2020 | 02 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $41,050 | $179,660 | Implemented |
UU0160 # 04 Y:2020 | 04 | 2020 | ELIMINATE LEAKS IN WATER LINES AND VALVES | $14,460 | $13,100 | Implemented |