IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

511

matching recommendations
Reset
SIC 20 Food and Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0514 # 02 Y:2017 02 2017 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $7,847 $20,000 Implemented
UF0514 # 06 Y:2017 06 2017 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,693 $6,775 Implemented
UF0514 # 05 Y:2017 05 2017 INSTALL / REPAIR INSULATION ON STEAM LINES $3,740 $2,882 Implemented
UF0514 # 01 Y:2017 01 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $40,154 $30,844 Implemented
UF0514 # 04 Y:2017 04 2017 REDUCE EXCESS STEAM BLEEDING $4,320 $0 Implemented
UF0514 # 07 Y:2017 07 2017 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,432 $0 Implemented
UF0514 # 03 Y:2017 03 2017 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $5,710 $7,580 Not Implemented
UU0126 # 01 Y:2017 01 2017 MINIMIZE CONTAMINATION OF WATER BEFORE TREATMENT $207,807 $2,000,000 Not Implemented
UU0126 # 03 Y:2017 03 2017 REPLACE BOILER $26,315 $176,427 Not Implemented
UU0126 # 05 Y:2017 05 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $10,358 $90 Implemented
UU0126 # 04 Y:2017 04 2017 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $14,977 $8,120 Not Implemented
UU0126 # 02 Y:2017 02 2017 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $27,838 $3,980 Implemented
UU0126 # 06 Y:2017 06 2017 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $6,423 $2,000 Implemented
OR0696 # 01 Y:2017 01 2017 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $179,573 $3,044 Not Implemented
OR0696 # 02 Y:2017 02 2017 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $79,265 $37,275 Not Implemented
OR0696 # 03 Y:2017 03 2017 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $2,365 $5,880 Not Implemented
OR0696 # 04 Y:2017 04 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,910 $10,116 Not Implemented
LS0012 # 01 Y:2017 01 2017 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $28,766 $12,000 Not Implemented
UF0513 # 07 Y:2017 07 2017 INSTALL / REPAIR INSULATION ON STEAM LINES $2,443 $1,481 Implemented
LS0012 # 05 Y:2017 05 2017 REDUCE EXCESSIVE BOILER BLOWDOWN $3,685 $4,250 Not Implemented
UF0513 # 03 Y:2017 03 2017 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $14,487 $23,157 Implemented
UF0513 # 06 Y:2017 06 2017 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,848 $10,386 Not Implemented
LS0012 # 02 Y:2017 02 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,205 $920 Not Implemented
UF0513 # 08 Y:2017 08 2017 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,095 $5,053 Implemented
UF0513 # 02 Y:2017 02 2017 ISOLATE HOT OR COLD EQUIPMENT $25,893 $3,150 Implemented