IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

24

matching recommendations
Reset
SIC 201 Meat Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0260 # 08 Y:2021 08 2021 INSTALL OCCUPANCY SENSORS $401 $553 Implemented
TT0260 # 07 Y:2021 07 2021 INSULATE BARE EQUIPMENT $783 $700 Implemented
TN0596 # 07 Y:1996 07 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $580 $410 Implemented
TN0596 # 06 Y:1996 06 1996 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,170 $7,000 Implemented
TN0596 # 05 Y:1996 05 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,870 $4,200 Implemented
TN0596 # 02 Y:1996 02 1996 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $80,150 $1,130 Implemented
TN0325 # 02 Y:1987 02 1987 USE MINIMUM STEAM OPERATING PRESSURE $2,633 $0 Implemented
TN0325 # 07 Y:1987 07 1987 INSULATE BARE EQUIPMENT $204 $50 Implemented
TN0325 # 06 Y:1987 06 1987 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $218 $0 Implemented
TN0325 # 05 Y:1987 05 1987 REPAIR AND ELIMINATE STEAM LEAKS $849 $75 Implemented
TN0325 # 04 Y:1987 04 1987 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,134 $90 Implemented
TN0325 # 03 Y:1987 03 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,019 $5,000 Implemented
TN0325 # 01 Y:1987 01 1987 INSTALL / REPAIR INSULATION ON STEAM LINES $10,904 $421 Implemented
TN0316 # 09 Y:1987 09 1987 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $228 $72 Implemented
TN0316 # 08 Y:1987 08 1987 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,099 $150 Implemented
TN0316 # 07 Y:1987 07 1987 RECOVER WASTE HEAT FROM EQUIPMENT $515 $800 Implemented
TN0316 # 06 Y:1987 06 1987 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $254 $300 Implemented
TN0316 # 05 Y:1987 05 1987 INSULATE BARE EQUIPMENT $2,271 $4,080 Implemented
TN0316 # 03 Y:1987 03 1987 IMPROVE LUBRICATION PRACTICES $3,136 $3,000 Implemented
TN0316 # 02 Y:1987 02 1987 USE MINIMUM STEAM OPERATING PRESSURE $612 $0 Implemented
TN0316 # 01 Y:1987 01 1987 INSTALL / REPAIR INSULATION ON STEAM LINES $12,770 $2,128 Implemented
TN0192 # 01 Y:1983 01 1983 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $6,800 $0 Implemented
TN0192 # 03 Y:1983 03 1983 INSTALL / REPAIR INSULATION ON STEAM LINES $940 $200 Implemented
TN0192 # 02 Y:1983 02 1983 INSULATE BARE EQUIPMENT $325 $12,000 Implemented