IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

51

matching recommendations
Reset
SIC 201 Meat Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0218 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $33,997 $8,799 Not Implemented
IC0218 # 02 Y:2019 02 2019 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $63,690 $6,300 Not Implemented
IC0218 # 03 Y:2019 03 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,151 $14,700 Not Implemented
IC0218 # 04 Y:2019 04 2019 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $6,883 $8,244 Not Implemented
IC0127 # 07 Y:2007 07 2007 INSULATE BARE EQUIPMENT $3,818 $886 Implemented
IC0127 # 01 Y:2007 01 2007 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $14,659 $0 Implemented
IC0127 # 03 Y:2007 03 2007 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $9,063 $51,889 Implemented
IC0127 # 09 Y:2007 09 2007 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $9,282 $0 Implemented
IC0127 # 05 Y:2007 05 2007 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $36,459 $0 Implemented
IC0127 # 06 Y:2007 06 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,336 $20,976 Implemented
IC0127 # 08 Y:2007 08 2007 REPAIR AND ELIMINATE STEAM LEAKS $2,137 $1,000 Implemented
IC0127 # 10 Y:2007 10 2007 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS $22,675 $50,711 Implemented
IC0127 # 04 Y:2007 04 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $120 $1,026 Implemented
IC0127 # 02 Y:2007 02 2007 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $800 $440 Implemented
IC0081 # 07 Y:2004 07 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,098 $23,216 Not Implemented
IC0081 # 03 Y:2004 03 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,195 $600 Implemented
IC0081 # 04 Y:2004 04 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $347 $0 Implemented
IC0081 # 05 Y:2004 05 2004 UPGRADE OBSOLETE EQUIPMENT $411 $2,300 Not Implemented
IC0081 # 01 Y:2004 01 2004 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $599 $0 Implemented
IC0081 # 02 Y:2004 02 2004 INSTALL SET-BACK TIMERS $2,895 $159 Implemented
IC0081 # 06 Y:2004 06 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,022 $22,332 Not Implemented
IC0081 # 09 Y:2004 09 2004 USE PHOTOCELL CONTROLS $539 $199 Not Implemented
IC0081 # 08 Y:2004 08 2004 USE PHOTOCELL CONTROLS $6,675 $6,231 Not Implemented
BD0262 # 05 Y:2004 05 2004 INSTALL OCCUPANCY SENSORS $3,267 $1,200 Implemented
BD0262 # 13 Y:2004 13 2004 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $13,000 $300 Implemented