Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
51
matching recommendationsSIC | 201 | Meat Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IC0218 # 01 Y:2019 | 01 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $33,997 | $8,799 | Not Implemented |
IC0218 # 02 Y:2019 | 02 | 2019 | USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE | $63,690 | $6,300 | Not Implemented |
IC0218 # 03 Y:2019 | 03 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $10,151 | $14,700 | Not Implemented |
IC0218 # 04 Y:2019 | 04 | 2019 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $6,883 | $8,244 | Not Implemented |
IC0127 # 07 Y:2007 | 07 | 2007 | INSULATE BARE EQUIPMENT | $3,818 | $886 | Implemented |
IC0127 # 01 Y:2007 | 01 | 2007 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $14,659 | $0 | Implemented |
IC0127 # 03 Y:2007 | 03 | 2007 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $9,063 | $51,889 | Implemented |
IC0127 # 09 Y:2007 | 09 | 2007 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $9,282 | $0 | Implemented |
IC0127 # 05 Y:2007 | 05 | 2007 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $36,459 | $0 | Implemented |
IC0127 # 06 Y:2007 | 06 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,336 | $20,976 | Implemented |
IC0127 # 08 Y:2007 | 08 | 2007 | REPAIR AND ELIMINATE STEAM LEAKS | $2,137 | $1,000 | Implemented |
IC0127 # 10 Y:2007 | 10 | 2007 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS | $22,675 | $50,711 | Implemented |
IC0127 # 04 Y:2007 | 04 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $120 | $1,026 | Implemented |
IC0127 # 02 Y:2007 | 02 | 2007 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $800 | $440 | Implemented |
IC0081 # 07 Y:2004 | 07 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,098 | $23,216 | Not Implemented |
IC0081 # 03 Y:2004 | 03 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,195 | $600 | Implemented |
IC0081 # 04 Y:2004 | 04 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $347 | $0 | Implemented |
IC0081 # 05 Y:2004 | 05 | 2004 | UPGRADE OBSOLETE EQUIPMENT | $411 | $2,300 | Not Implemented |
IC0081 # 01 Y:2004 | 01 | 2004 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $599 | $0 | Implemented |
IC0081 # 02 Y:2004 | 02 | 2004 | INSTALL SET-BACK TIMERS | $2,895 | $159 | Implemented |
IC0081 # 06 Y:2004 | 06 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,022 | $22,332 | Not Implemented |
IC0081 # 09 Y:2004 | 09 | 2004 | USE PHOTOCELL CONTROLS | $539 | $199 | Not Implemented |
IC0081 # 08 Y:2004 | 08 | 2004 | USE PHOTOCELL CONTROLS | $6,675 | $6,231 | Not Implemented |
BD0262 # 05 Y:2004 | 05 | 2004 | INSTALL OCCUPANCY SENSORS | $3,267 | $1,200 | Implemented |
BD0262 # 13 Y:2004 | 13 | 2004 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $13,000 | $300 | Implemented |