Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
56
matching recommendationsSIC | 201 | Meat Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0870 # 04 Y:2013 | 04 | 2013 | MAKE ICE DURING OFF PEAK HOURS FOR COOLING | $20,022 | $105,120 | Not Implemented |
OK0870 # 03 Y:2013 | 03 | 2013 | DEVELOP A REPAIR/REPLACE POLICY | $1,212 | $2,500 | Not Implemented |
OK0870 # 02 Y:2013 | 02 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,957 | $0 | Implemented |
OK0870 # 01 Y:2013 | 01 | 2013 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $8,384 | $0 | Implemented |
CO0678 # 02 Y:2013 | 02 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,540 | $200 | Implemented |
CO0678 # 03 Y:2013 | 03 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,340 | $8,100 | Not Implemented |
CO0678 # 04 Y:2013 | 04 | 2013 | INSTALL / REPAIR INSULATION ON STEAM LINES | $890 | $350 | Not Implemented |
CO0678 # 05 Y:2013 | 05 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,580 | $15,680 | Not Implemented |
CO0678 # 06 Y:2013 | 06 | 2013 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $8,240 | $1,500 | Implemented |
CO0678 # 01 Y:2013 | 01 | 2013 | UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM | $6,330 | $14,900 | Not Implemented |
UD0884 # 06 Y:2013 | 06 | 2013 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $6,058 | $500 | Implemented |
UD0884 # 12 Y:2013 | 12 | 2013 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $1,101 | $0 | Implemented |
UD0884 # 03 Y:2013 | 03 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,136 | $7,000 | Implemented |
UD0884 # 04 Y:2013 | 04 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $11,400 | $19,000 | Implemented |
UD0884 # 05 Y:2013 | 05 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $936 | $500 | Implemented |
UD0884 # 11 Y:2013 | 11 | 2013 | AVOID FROST FORMATION ON EVAPORATORS | $1,417 | $0 | Implemented |
UD0884 # 10 Y:2013 | 10 | 2013 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $2,365 | $11,824 | Implemented |
UD0884 # 01 Y:2013 | 01 | 2013 | OPTIMIZE PLANT POWER FACTOR | $9,148 | $1,000 | Implemented |
UD0884 # 08 Y:2013 | 08 | 2013 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $8,876 | $0 | Implemented |
UD0884 # 07 Y:2013 | 07 | 2013 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $7,470 | $0 | Implemented |
UD0884 # 02 Y:2013 | 02 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,605 | $19,350 | Implemented |
UD0884 # 09 Y:2013 | 09 | 2013 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $2,533 | $2,000 | Implemented |
UD0880 # 13 Y:2013 | 13 | 2013 | INSULATE BARE EQUIPMENT | $3,572 | $1,221 | Implemented |
UD0880 # 14 Y:2013 | 14 | 2013 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $17,352 | $0 | Implemented |
UD0880 # 03 Y:2013 | 03 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,581 | $15,000 | Implemented |