IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

397

matching recommendations
Reset
SIC 2011 Meat Packing Plants
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0965 # 10 Y:2017 10 2017 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $41,935 $20,000 Implemented
UD0965 # 12 Y:2017 12 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,081 $1,230 Implemented
OK0951 # 04 Y:2016 04 2016 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $8,904 $3,000 Implemented
OK0951 # 05 Y:2016 05 2016 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $5,675 $2,816 Implemented
AM0709 # 01 Y:2016 01 2016 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $7,770 $1,520 Implemented
AM0709 # 04 Y:2016 04 2016 USE SYNTHETIC LUBRICANT $2,314 $0 Implemented
AM0709 # 02 Y:2016 02 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,800 $13,090 Implemented
LE0416 # 01 Y:2016 01 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $43,389 $1,000 Implemented
LE0416 # 16 Y:2016 16 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $704 $3,408 Implemented
LE0416 # 06 Y:2016 06 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $85,792 $97,000 Implemented
LE0416 # 02 Y:2016 02 2016 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $22,973 $9,000 Implemented
LE0416 # 12 Y:2016 12 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,521 $4,533 Implemented
UD0899 # 06 Y:2014 06 2014 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $1,303 $0 Implemented
UD0899 # 08 Y:2014 08 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $969 $2,127 Implemented
UD0899 # 02 Y:2014 02 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $388 $0 Implemented
UD0899 # 05 Y:2014 05 2014 USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS $2,075 $0 Implemented
CO0678 # 02 Y:2013 02 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,540 $200 Implemented
CO0678 # 06 Y:2013 06 2013 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $8,240 $1,500 Implemented
UD0884 # 03 Y:2013 03 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,136 $7,000 Implemented
UD0884 # 01 Y:2013 01 2013 OPTIMIZE PLANT POWER FACTOR $9,148 $1,000 Implemented
UD0884 # 06 Y:2013 06 2013 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $6,058 $500 Implemented
UD0884 # 07 Y:2013 07 2013 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $7,470 $0 Implemented
UD0884 # 10 Y:2013 10 2013 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,365 $11,824 Implemented
UD0884 # 02 Y:2013 02 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,605 $19,350 Implemented
UD0884 # 04 Y:2013 04 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $11,400 $19,000 Implemented