IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

781

matching recommendations
Reset
SIC 2011 Meat Packing Plants
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NL0039 # 04 Y:2019 04 2019 MINIMIZE WATER USAGE $10,832 $1,127 Implemented
NL0039 # 03 Y:2019 03 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,128 $2,497 Implemented
NL0039 # 02 Y:2019 02 2019 REPAIR OR REPLACE STEAM TRAPS $15,324 $44 Implemented
NL0039 # 01 Y:2019 01 2019 OPTIMIZE PLANT POWER FACTOR $36,367 $39,000 Implemented
IC0218 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $33,997 $8,799 Not Implemented
IC0218 # 02 Y:2019 02 2019 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $63,690 $6,300 Not Implemented
IC0218 # 03 Y:2019 03 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,151 $14,700 Not Implemented
IC0218 # 04 Y:2019 04 2019 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $6,883 $8,244 Not Implemented
IP0108 # 12 Y:2018 12 2018 OPTIMIZE PLANT POWER FACTOR $864 $4,146 Not Implemented
IP0108 # 11 Y:2018 11 2018 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $352 $1,323 Not Implemented
IP0108 # 10 Y:2018 10 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,909 $19,975 Not Implemented
IP0108 # 09 Y:2018 09 2018 RECOVER WASTE HEAT FROM EQUIPMENT $1,070 $2,129 Not Implemented
IP0108 # 08 Y:2018 08 2018 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $685 $1,022 Not Implemented
IP0108 # 07 Y:2018 07 2018 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $115 $53 Not Implemented
IP0108 # 06 Y:2018 06 2018 USE SOLAR HEAT TO MAKE ELECTRICTY $6,000 $3,479 Not Implemented
IP0108 # 05 Y:2018 05 2018 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,465 $322 Not Implemented
IP0108 # 04 Y:2018 04 2018 INSTALL OCCUPANCY SENSORS $2,230 $339 Not Implemented
IP0108 # 03 Y:2018 03 2018 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $12,119 $600 Not Implemented
IP0108 # 01 Y:2018 01 2018 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,011 $0 Not Implemented
IP0108 # 02 Y:2018 02 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $880 $4 Not Implemented
AM0749 # 01 Y:2018 01 2018 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $136,440 $167,100 Not Implemented
AM0749 # 02 Y:2018 02 2018 COMBINE UTILITY METERS $65,915 $10,000 Not Implemented
AM0749 # 03 Y:2018 03 2018 OPTIMIZE PLANT POWER FACTOR $31,797 $45,252 Not Implemented
AM0749 # 04 Y:2018 04 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $17,000 $15,400 Not Implemented
AM0749 # 05 Y:2018 05 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,165 $40 Not Implemented