IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

38

matching recommendations
Reset
SIC 2013 Sausages And Other Prepared Meats
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0943 # 05 Y:2020 05 2020 INSULATE BARE EQUIPMENT $736 $1,938 Implemented
GT0943 # 04 Y:2020 04 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,306 $3,500 Implemented
GT0943 # 02 Y:2020 02 2020 INSTALL OCCUPANCY SENSORS $4,323 $2,678 Implemented
GT0943 # 01 Y:2020 01 2020 INSTALL TIMERS AND/OR THERMOSTATS $3,005 $563 Implemented
GT0903 # 05 Y:2017 05 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,199 $23,157 Implemented
GT0903 # 04 Y:2017 04 2017 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,339 $3,360 Implemented
GT0903 # 03 Y:2017 03 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $308 $267 Implemented
GT0903 # 01 Y:2017 01 2017 INSTALL TIMERS AND/OR THERMOSTATS $295 $100 Implemented
GT0880 # 05 Y:2011 05 2011 USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE $70,097 $17,000 Implemented
GT0880 # 01 Y:2011 01 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,831 $1,250 Implemented
GT0880 # 04 Y:2011 04 2011 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $75,872 $100,115 Implemented
GT0778 # 04 Y:2004 04 2004 INSULATE BARE EQUIPMENT $927 $600 Implemented
GT0778 # 02 Y:2004 02 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,032 $3,228 Implemented
GT0707 # 07 Y:2001 07 2001 MODIFY STARTUP/SHUTDOWN TIMES $45,820 $0 Implemented
GT0707 # 06 Y:2001 06 2001 REPLACE THE CHLORINATION STAGE WITH AN OXYGEN OR OZONE STAGE $7,808 $0 Implemented
GT0707 # 05 Y:2001 05 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $103 $72 Implemented
GT0707 # 03 Y:2001 03 2001 REUSE / RECYCLE/ SELL PAPER PRODUCTS $2,040 $6,700 Implemented
GT0620 # 03 Y:1997 03 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,270 $6,830 Implemented
GT0620 # 05 Y:1997 05 1997 ELIMINATE LEAKS IN WATER LINES AND VALVES $55 $50 Implemented
GT0378 # 06 Y:1989 06 1989 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,183 $1,725 Implemented
GT0378 # 05 Y:1989 05 1989 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $250 $300 Implemented
GT0378 # 04 Y:1989 04 1989 UTILIZE SENSORS CONTROLLING ROOF AND WALL OPENINGS $65 $40 Implemented
GT0378 # 03 Y:1989 03 1989 USE DEMAND CONTROLLER OR LOAD SHEDDER $6,940 $9,000 Implemented
GT0378 # 02 Y:1989 02 1989 INSTALL SET-BACK TIMERS $800 $160 Implemented
GT0378 # 01 Y:1989 01 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $270 $722 Implemented