IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

323

matching recommendations
Reset
SIC 2015 Poultry Slaughtering And Processing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0235 # 05 Y:1992 05 1992 INSULATE BARE EQUIPMENT $3,720 $3,860 Implemented
CO0235 # 06 Y:1992 06 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $31,290 $7,560 Implemented
CO0235 # 07 Y:1992 07 1992 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $585 $750 Implemented
CO0235 # 08 Y:1992 08 1992 RECOVER WASTE HEAT FROM EQUIPMENT $30,500 $60,000 Implemented
CO0235 # 09 Y:1992 09 1992 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $18,740 $57,080 Implemented
GT0447 # 01 Y:1991 01 1991 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $9,880 $500 Implemented
GT0447 # 02 Y:1991 02 1991 INSULATE BARE EQUIPMENT $534 $1,330 Implemented
GT0447 # 03 Y:1991 03 1991 REPAIR AND ELIMINATE STEAM LEAKS $754 $150 Implemented
GT0447 # 04 Y:1991 04 1991 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,147 $5,838 Implemented
GT0447 # 05 Y:1991 05 1991 HEAT WATER WITH EXHAUST HEAT $60,730 $125,000 Implemented
OR0081 # 01 Y:1990 01 1990 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $4,762 $68,000 Implemented
OR0081 # 02 Y:1990 02 1990 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $3,741 $635 Implemented
OR0081 # 03 Y:1990 03 1990 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,720 $10,000 Implemented
OR0081 # 05 Y:1990 05 1990 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $137 $324 Implemented
OR0076 # 01 Y:1990 01 1990 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,574 $1,000 Implemented
OR0076 # 03 Y:1990 03 1990 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $655 $345 Implemented
OR0076 # 06 Y:1990 06 1990 INSULATE BARE EQUIPMENT $206 $333 Implemented
OR0076 # 07 Y:1990 07 1990 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $2,585 $6,190 Implemented
OR0076 # 08 Y:1990 08 1990 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $434 $1,118 Implemented
GT0390 # 01 Y:1989 01 1989 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,040 $0 Implemented
GT0390 # 02 Y:1989 02 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $604 $2,400 Implemented
GT0390 # 03 Y:1989 03 1989 INSULATE BARE EQUIPMENT $534 $1,020 Implemented
GT0390 # 04 Y:1989 04 1989 INSTALL / REPAIR INSULATION ON STEAM LINES $423 $210 Implemented
GT0390 # 05 Y:1989 05 1989 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $219 $350 Implemented
GT0390 # 07 Y:1989 07 1989 RECOVER WASTE HEAT FROM EQUIPMENT $68,230 $29,500 Implemented