IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,313

matching recommendations
Reset
SIC 202 Dairy Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BS0028 # 02 Y:2014 02 2014 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $10,219 $7,950 Implemented
BS0028 # 03 Y:2014 03 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,895 $15,396 Implemented
BS0028 # 04 Y:2014 04 2014 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $8,837 $449 Implemented
BS0028 # 05 Y:2014 05 2014 REPAIR OR REPLACE STEAM TRAPS $60,962 $13,425 Implemented
BS0028 # 08 Y:2014 08 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,203 $15,635 Implemented
AM0643 # 01 Y:2013 01 2013 INCREASE AMOUNT OF CONDENSATE RETURNED $34,060 $250,000 Implemented
AM0643 # 02 Y:2013 02 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $12,370 $50 Implemented
AM0643 # 04 Y:2013 04 2013 INSULATE BARE EQUIPMENT $1,940 $235 Implemented
AM0643 # 05 Y:2013 05 2013 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,900 $500 Implemented
AM0643 # 06 Y:2013 06 2013 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,960 $500 Implemented
MZ0112 # 01 Y:2013 01 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,576 $14,260 Implemented
MZ0112 # 02 Y:2013 02 2013 INSTALL OCCUPANCY SENSORS $6,417 $3,000 Implemented
MZ0112 # 04 Y:2013 04 2013 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,415 $0 Implemented
MZ0112 # 05 Y:2013 05 2013 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $48,000 $2,270 Implemented
BS0009 # 01 Y:2013 01 2013 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,591 $260 Implemented
BS0009 # 04 Y:2013 04 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,077 $689 Implemented
BS0009 # 05 Y:2013 05 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,037 $126 Implemented
BS0009 # 06 Y:2013 06 2013 INSTALL / REPAIR INSULATION ON STEAM LINES $5,422 $3,959 Implemented
SU0336 # 01 Y:2013 01 2013 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $31 $0 Implemented
SU0336 # 03 Y:2013 03 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $250 $12,804 Implemented
AM0627 # 02 Y:2012 02 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,546 $980 Implemented
OR0594 # 03 Y:2012 03 2012 Install Anaerobic Digester $1,369,423 $3,468,069 Implemented
OR0594 # 04 Y:2012 04 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,684 $7,360 Implemented
OR0587 # 05 Y:2012 05 2012 INSTALL OCCUPANCY SENSORS $2,854 $2,854 Implemented
SF0419 # 01 Y:2012 01 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $637 $80 Implemented