IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

25

matching recommendations
Reset
SIC 202 Dairy Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UL0236 # 01 Y:1999 01 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,472 $20 Implemented
CO0454 # 06 Y:1999 06 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $392 $0 Implemented
IA0235 # 10 Y:1999 10 1999 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $995 $1,046 Implemented
IA0235 # 04 Y:1999 04 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $554 $43 Implemented
IA0235 # 01 Y:1999 01 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $9,832 $0 Implemented
CO0454 # 08 Y:1999 08 1999 ELIMINATE LEAKS IN WATER LINES AND VALVES $350 $490 Implemented
CO0454 # 05 Y:1999 05 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $610 $30 Implemented
CO0454 # 04 Y:1999 04 1999 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $1,010 $0 Implemented
CO0454 # 03 Y:1999 03 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,630 $80 Implemented
CO0454 # 02 Y:1999 02 1999 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,460 $7,500 Implemented
KU0524 # 07 Y:1999 07 1999 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $600 $0 Implemented
KU0524 # 06 Y:1999 06 1999 USE SYNTHETIC LUBRICANT $650 $1,160 Implemented
BD0141 # 03 Y:1999 03 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $12,301 $500 Implemented
KU0524 # 05 Y:1999 05 1999 INSULATE BARE EQUIPMENT $750 $680 Implemented
KU0524 # 04 Y:1999 04 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,070 $1,270 Implemented
KU0524 # 03 Y:1999 03 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,820 $3,790 Implemented
KU0524 # 02 Y:1999 02 1999 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $9,110 $2,500 Implemented
KU0524 # 01 Y:1999 01 1999 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $9,520 $18,350 Implemented
ME0256 # 02 Y:1999 02 1999 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $4,700 $900 Implemented
ME0256 # 03 Y:1999 03 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,563 $2,500 Implemented
ME0256 # 04 Y:1999 04 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $512 $185 Implemented
ME0256 # 05 Y:1999 05 1999 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $337 $400 Implemented
ME0256 # 06 Y:1999 06 1999 INSULATE BARE EQUIPMENT $325 $400 Implemented
ME0256 # 07 Y:1999 07 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $319 $590 Implemented
ME0256 # 08 Y:1999 08 1999 INSULATE BARE EQUIPMENT $236 $93 Implemented