Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
32
matching recommendationsSIC | 202 | Dairy Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0442 # 05 Y:2003 | 05 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,470 | $0 | Implemented |
OR0442 # 04 Y:2003 | 04 | 2003 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $7,900 | $0 | Implemented |
OR0442 # 03 Y:2003 | 03 | 2003 | USE PHOTOCELL CONTROLS | $11,250 | $1,340 | Not Implemented |
OR0442 # 02 Y:2003 | 02 | 2003 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $21,500 | $11,700 | Implemented |
OR0442 # 01 Y:2003 | 01 | 2003 | FLASH CONDENSATE TO PRODUCE LOWER PRESSURE STEAM | $27,900 | $23,290 | Not Implemented |
OR0442 # 06 Y:2003 | 06 | 2003 | INSTALL ISOLATION TRANSFORMER ON ADJUSTABLE FREQUENCY DRIVE | $580 | $1,400 | Not Implemented |
OR0441 # 01 Y:2003 | 01 | 2003 | ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS | $65,260 | $70,100 | Implemented |
OR0441 # 02 Y:2003 | 02 | 2003 | SHUT OFF STEAM TRAPS ON SUPER HEATED STEAM LINES WHEN NOT IN USE | $18,970 | $2,160 | Implemented |
OR0441 # 03 Y:2003 | 03 | 2003 | INSTALL / REPAIR INSULATION ON STEAM LINES | $4,670 | $985 | Implemented |
OR0441 # 04 Y:2003 | 04 | 2003 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $18,900 | $10,080 | Implemented |
SF0269 # 01 Y:2003 | 01 | 2003 | ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS | $5,192 | $0 | Not Implemented |
SF0269 # 02 Y:2003 | 02 | 2003 | IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS | $635 | $0 | Implemented |
SF0269 # 07 Y:2003 | 07 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $633 | $1,743 | Not Implemented |
SF0269 # 03 Y:2003 | 03 | 2003 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $1,974 | $0 | Not Implemented |
SF0269 # 04 Y:2003 | 04 | 2003 | INSULATE BARE EQUIPMENT | $5,516 | $3,984 | Not Implemented |
SF0269 # 05 Y:2003 | 05 | 2003 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,653 | $0 | Implemented |
SF0269 # 06 Y:2003 | 06 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,739 | $3,905 | Not Implemented |
IA0325 # 08 Y:2003 | 08 | 2003 | INSTALL OCCUPANCY SENSORS | $53 | $133 | Not Implemented |
IA0325 # 07 Y:2003 | 07 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,473 | $11,035 | Implemented |
IA0325 # 06 Y:2003 | 06 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $508 | $25 | Implemented |
IA0325 # 05 Y:2003 | 05 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $957 | $245 | Implemented |
IA0325 # 04 Y:2003 | 04 | 2003 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $7,965 | $4,000 | Not Implemented |
IA0325 # 03 Y:2003 | 03 | 2003 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS | $53,817 | $18,000 | Implemented |
IA0325 # 02 Y:2003 | 02 | 2003 | DIRECT WARMEST AIR TO COMBUSTION INTAKE | $2,881 | $2,200 | Not Implemented |
IA0325 # 01 Y:2003 | 01 | 2003 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $18,064 | $1,000 | Implemented |