IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

511

matching recommendations
Reset
SIC 2022 Cheese, Natural And Processed
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0076 # 02 Y:2004 02 2004 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $13,524 $49,376 Implemented
IC0076 # 03 Y:2004 03 2004 ISOLATE HOT OR COLD EQUIPMENT $1,539 $364 Not Implemented
IC0076 # 04 Y:2004 04 2004 REPAIR AND ELIMINATE STEAM LEAKS $2,133 $2,700 Implemented
IC0076 # 05 Y:2004 05 2004 INSTALL / REPAIR INSULATION ON STEAM LINES $346 $736 Implemented
IC0076 # 06 Y:2004 06 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,310 $39,933 n/a
IC0076 # 07 Y:2004 07 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,259 $13,444 Implemented
IC0076 # 08 Y:2004 08 2004 INSTALL OCCUPANCY SENSORS $5,168 $7,933 Implemented
IC0076 # 09 Y:2004 09 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $333 $501 Not Implemented
IC0076 # 10 Y:2004 10 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,261 $5,660 Implemented
IC0076 # 11 Y:2004 11 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $848 $0 Not Implemented
IC0076 # 12 Y:2004 12 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,820 $1,000 Implemented
MS0243 # 01 Y:2004 01 2004 HEAT WATER WITH EXHAUST HEAT $10,578 $12,948 Not Implemented
MS0243 # 02 Y:2004 02 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,144 $10,559 Not Implemented
MS0243 # 03 Y:2004 03 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,790 $0 Not Implemented
MS0243 # 04 Y:2004 04 2004 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $4,691 $1,256 Not Implemented
MS0243 # 05 Y:2004 05 2004 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $3,385 $0 Not Implemented
MS0243 # 06 Y:2004 06 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $614 $114 Not Implemented
OR0442 # 01 Y:2003 01 2003 FLASH CONDENSATE TO PRODUCE LOWER PRESSURE STEAM $27,900 $23,290 Not Implemented
OR0442 # 02 Y:2003 02 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $21,500 $11,700 Implemented
OR0442 # 03 Y:2003 03 2003 USE PHOTOCELL CONTROLS $11,250 $1,340 Not Implemented
OR0442 # 04 Y:2003 04 2003 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $7,900 $0 Implemented
OR0442 # 05 Y:2003 05 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,470 $0 Implemented
OR0442 # 06 Y:2003 06 2003 INSTALL ISOLATION TRANSFORMER ON ADJUSTABLE FREQUENCY DRIVE $580 $1,400 Not Implemented
IA0325 # 01 Y:2003 01 2003 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $18,064 $1,000 Implemented
IA0325 # 02 Y:2003 02 2003 DIRECT WARMEST AIR TO COMBUSTION INTAKE $2,881 $2,200 Not Implemented