IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

490

matching recommendations
Reset
SIC 2022 Cheese, Natural And Processed
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0442 # 05 Y:2003 05 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,470 $0 Implemented
OR0442 # 06 Y:2003 06 2003 INSTALL ISOLATION TRANSFORMER ON ADJUSTABLE FREQUENCY DRIVE $580 $1,400 Not Implemented
IA0325 # 01 Y:2003 01 2003 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $18,064 $1,000 Implemented
IA0325 # 02 Y:2003 02 2003 DIRECT WARMEST AIR TO COMBUSTION INTAKE $2,881 $2,200 Not Implemented
IA0325 # 03 Y:2003 03 2003 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS $53,817 $18,000 Implemented
IA0325 # 04 Y:2003 04 2003 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $7,965 $4,000 Not Implemented
IA0325 # 05 Y:2003 05 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $957 $245 Implemented
IA0325 # 06 Y:2003 06 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $508 $25 Implemented
IA0325 # 07 Y:2003 07 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,473 $11,035 Implemented
IA0325 # 08 Y:2003 08 2003 INSTALL OCCUPANCY SENSORS $53 $133 Not Implemented
IA0325 # 09 Y:2003 09 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $643 $433 Not Implemented
SD0307 # 01 Y:2002 01 2002 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $115,174 $476,400 Not Implemented
SD0307 # 02 Y:2002 02 2002 RECOVER WASTE HEAT FROM EQUIPMENT $6,963 $18,000 Not Implemented
SD0307 # 03 Y:2002 03 2002 INSULATE BARE EQUIPMENT $1,517 $2,500 Not Implemented
SD0307 # 04 Y:2002 04 2002 INSTALL OCCUPANCY SENSORS $933 $1,200 Not Implemented
SD0307 # 05 Y:2002 05 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $785 $0 Not Implemented
SD0307 # 06 Y:2002 06 2002 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $1,134 $5,000 Not Implemented
SF0217 # 01 Y:2001 01 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,715 $0 Implemented
SF0217 # 02 Y:2001 02 2001 REPAIR AND ELIMINATE STEAM LEAKS $611 $0 Implemented
SF0217 # 03 Y:2001 03 2001 COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER $2,551 $248 Implemented
SF0217 # 04 Y:2001 04 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,181 $3,150 Implemented
SF0217 # 05 Y:2001 05 2001 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,600 $1,761 Implemented
SF0217 # 06 Y:2001 06 2001 INSULATE BARE EQUIPMENT $730 $1,032 Implemented
SF0217 # 07 Y:2001 07 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,141 $2,088 Not Implemented
SF0217 # 08 Y:2001 08 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,410 $15,510 Implemented