IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

89

matching recommendations
Reset
SIC 2022 Cheese, Natural And Processed
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0404 # 02 Y:2011 02 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,243 $0 Implemented
SF0404 # 01 Y:2011 01 2011 OPERATE BOILERS ON HIGH FIRE SETTING $2,708 $0 Not Implemented
SD0434 # 06 Y:2011 06 2011 INSTALL SKYLIGHTS $11,302 $26,616 Not Implemented
SD0434 # 05 Y:2011 05 2011 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $1,400 $2,063 Implemented
SD0434 # 04 Y:2011 04 2011 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $4,279 $4,751 Not Implemented
SD0434 # 03 Y:2011 03 2011 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,711 $500 Not Implemented
SD0434 # 02 Y:2011 02 2011 INSTALL OCCUPANCY SENSORS $7,897 $1,387 Implemented
SD0434 # 01 Y:2011 01 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $799 $100 Implemented
LM0116 # 06 Y:2006 06 2006 TURN OFF EQUIPMENT WHEN NOT IN USE $260 $0 Implemented
LM0116 # 05 Y:2006 05 2006 $337,500 $5,000 Not Implemented
LM0116 # 04 Y:2006 04 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $230,613 $69,350 Implemented
LM0116 # 03 Y:2006 03 2006 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $2,913 $7,000 Not Implemented
LM0116 # 01 Y:2006 01 2006 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $12,946 $0 Not Implemented
LM0116 # 02 Y:2006 02 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $111,472 $82,700 Implemented
SD0307 # 01 Y:2002 01 2002 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $115,174 $476,400 Not Implemented
SD0307 # 02 Y:2002 02 2002 RECOVER WASTE HEAT FROM EQUIPMENT $6,963 $18,000 Not Implemented
SD0307 # 03 Y:2002 03 2002 INSULATE BARE EQUIPMENT $1,517 $2,500 Not Implemented
SD0307 # 04 Y:2002 04 2002 INSTALL OCCUPANCY SENSORS $933 $1,200 Not Implemented
SD0307 # 05 Y:2002 05 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $785 $0 Not Implemented
SD0307 # 06 Y:2002 06 2002 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $1,134 $5,000 Not Implemented
SF0217 # 03 Y:2001 03 2001 COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER $2,551 $248 Implemented
SF0217 # 09 Y:2001 09 2001 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $1,231 $4,000 Not Implemented
SF0217 # 08 Y:2001 08 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,410 $15,510 Implemented
SF0217 # 07 Y:2001 07 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,141 $2,088 Not Implemented
SF0217 # 06 Y:2001 06 2001 INSULATE BARE EQUIPMENT $730 $1,032 Implemented