IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

506

matching recommendations
Reset
SIC 2024 Ice Cream And Frozen Desserts
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0057 # 10 Y:2004 10 2004 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $398 $20 Implemented
UU0057 # 11 Y:2004 11 2004 USE REVERSE OSMOSIS TO CONCENTRATE MATERIAL $25,500 $192,450 Not Implemented
UU0040 # 01 Y:2003 01 2003 OPTIMIZE PLANT POWER FACTOR $1 $0 Not Implemented
UU0040 # 02 Y:2003 02 2003 UTILIZE A LESS EXPENSIVE COOLING METHOD $150 $0 Not Implemented
UU0040 # 03 Y:2003 03 2003 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,957 $0 Not Implemented
UU0040 # 04 Y:2003 04 2003 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $2,285 $0 Not Implemented
UU0040 # 05 Y:2003 05 2003 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $1 $0 Not Implemented
UU0040 # 06 Y:2003 06 2003 RECOVER WASTE HEAT FROM EQUIPMENT $57 $55 Not Implemented
OR0414 # 01 Y:2002 01 2002 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $657,000 $300,000 Not Implemented
OR0414 # 02 Y:2002 02 2002 INSTALL AUTOMATIC PACKING EQUIPMENT $124,333 $56,075 Not Implemented
OR0414 # 03 Y:2002 03 2002 INSTALL AUTOMATIC PACKING EQUIPMENT $6,650 $9,075 Implemented
OR0414 # 04 Y:2002 04 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $852 $0 Implemented
OR0414 # 05 Y:2002 05 2002 OPTIMIZE PLANT POWER FACTOR $960 $2,700 Not Implemented
WV0244 # 01 Y:2002 01 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,136 $108 Implemented
WV0244 # 02 Y:2002 02 2002 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $19,433 $900 Implemented
WV0244 # 03 Y:2002 03 2002 INSULATE BARE EQUIPMENT $1,318 $193 Implemented
WV0244 # 04 Y:2002 04 2002 INSTALL SPECTRAL REFLECTORS / DELAMP $3,380 $4,950 Not Implemented
WV0244 # 05 Y:2002 05 2002 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $2,244 $19,144 Not Implemented
WV0244 # 06 Y:2002 06 2002 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $9,994 $10,000 Not Implemented
WV0244 # 07 Y:2002 07 2002 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $9,266 $4,270 Implemented
WV0244 # 08 Y:2002 08 2002 METER WASTE WATER $29,520 $944 Implemented
WV0244 # 09 Y:2002 09 2002 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $13,076 $4,000 Not Implemented
WV0244 # 10 Y:2002 10 2002 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $13,200 $11,000 Not Implemented
MS0186 # 01 Y:2001 01 2001 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $13,374 $200 Not Implemented
MS0186 # 02 Y:2001 02 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $660 $1,415 Implemented