IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,402

matching recommendations
Reset
SIC 203 Preserved Fruits And Vegetables
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0264 # 10 Y:2025 10 2025 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $515 $916 Implemented
UU0264 # 03 Y:2025 03 2025 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $729,671 $3,645,455 Implemented
UU0264 # 07 Y:2025 07 2025 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,405 $8,915 Implemented
UU0264 # 06 Y:2025 06 2025 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,905 $7,317 Implemented
UU0264 # 02 Y:2025 02 2025 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $215,672 $730,950 Implemented
UU0264 # 05 Y:2025 05 2025 UPGRADE CONTROLS ON COMPRESSORS $3,332 $4,000 Implemented
UU0264 # 11 Y:2025 11 2025 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $44,506 $432,000 Implemented
UU0264 # 04 Y:2025 04 2025 REPLACE BOILER $379,077 $4,080,441 Implemented
OR0802 # 04 Y:2024 04 2024 REPLACE BOILER $37,073 $222,038 Implemented
UU0259 # 05 Y:2024 05 2024 STORE HEATED/ COOLED WATER FOR USE DURING PEAK DEMAND PERIODS $53,643 $33,000 Implemented
UU0259 # 06 Y:2024 06 2024 INSTALL COMMON HEADER ON COMPRESSORS $3,995 $9,200 Implemented
UU0259 # 04 Y:2024 04 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $68,165 $110,030 Implemented
UU0259 # 03 Y:2024 03 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $205,038 $1,865,253 Implemented
LS2413 # 01 Y:2024 01 2024 UPGRADE CONTROLS ON COMPRESSORS $68,225 $155,400 Implemented
LS2413 # 02 Y:2024 02 2024 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $5,076 $16,000 Implemented
LS2408 # 03 Y:2024 03 2024 REPLACE BOILER $57,645 $247,500 Implemented
LS2408 # 01 Y:2024 01 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,047 $135 Implemented
LS2408 # 02 Y:2024 02 2024 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $37,002 $144,549 Implemented
UU0236 # 02 Y:2024 02 2024 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $72,320 $46,000 Implemented
UU0236 # 04 Y:2024 04 2024 INSULATE BARE EQUIPMENT $5,640 $3,090 Implemented
UU0236 # 03 Y:2024 03 2024 INSULATE BARE EQUIPMENT $16,698 $11,570 Implemented
UU0236 # 01 Y:2024 01 2024 REPLACE BOILER $208,300 $1,070,720 Implemented
TR0048 # 06 Y:2023 06 2023 UPGRADE CONTROLS ON COMPRESSORS $6,430 $15,000 Implemented
TR0048 # 02 Y:2023 02 2023 INSTALL OCCUPANCY SENSORS $14,601 $10,663 Implemented
TR0048 # 01 Y:2023 01 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $33,304 $43,319 Implemented