Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,378
matching recommendationsSIC | 203 | Preserved Fruits And Vegetables |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0360 # 03 Y:2019 | 03 | 2019 | TURN OFF EQUIPMENT WHEN NOT IN USE | $9,735 | $3,600 | Implemented |
MI0360 # 04 Y:2019 | 04 | 2019 | OPTIMIZE PLANT POWER FACTOR | $5,613 | $13,630 | Implemented |
MI0360 # 05 Y:2019 | 05 | 2019 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $4,707 | $3,634 | Implemented |
MI0360 # 06 Y:2019 | 06 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,330 | $3,023 | Implemented |
MI0360 # 07 Y:2019 | 07 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,445 | $1,980 | Implemented |
MI0360 # 08 Y:2019 | 08 | 2019 | INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE | $1,675 | $3,764 | Implemented |
MI0360 # 09 Y:2019 | 09 | 2019 | INSTALL OCCUPANCY SENSORS | $751 | $211 | Implemented |
MI0360 # 11 Y:2019 | 11 | 2019 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $476 | $868 | Implemented |
MI0356 # 02 Y:2019 | 02 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $28,750 | $42,002 | Implemented |
MI0356 # 03 Y:2019 | 03 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $25,615 | $19,558 | Implemented |
MI0356 # 05 Y:2019 | 05 | 2019 | REDUCE EXCESSIVE BOILER BLOWDOWN | $10,928 | $8,500 | Implemented |
MI0356 # 06 Y:2019 | 06 | 2019 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $8,814 | $480 | Implemented |
MI0356 # 08 Y:2019 | 08 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,569 | $2,020 | Implemented |
LE0476 # 03 Y:2019 | 03 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $96,090 | $12,000 | Implemented |
LE0476 # 02 Y:2019 | 02 | 2019 | REPAIR OR REPLACE STEAM TRAPS | $19,944 | $1,143 | Implemented |
LE0476 # 01 Y:2019 | 01 | 2019 | ADJUST VENTS TO MINIMIZE ENERGY USE | $43,794 | $0 | Implemented |
SU0471 # 02 Y:2018 | 02 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,460 | $2,625 | Implemented |
SU0471 # 05 Y:2018 | 05 | 2018 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $703 | $1,240 | Implemented |
SU0471 # 06 Y:2018 | 06 | 2018 | INSULATE FEEDWATER TANK | $75 | $172 | Implemented |
UF0521 # 01 Y:2018 | 01 | 2018 | INCREASE AMOUNT OF CONDENSATE RETURNED | $45,855 | $11,386 | Implemented |
UF0521 # 02 Y:2018 | 02 | 2018 | USE SOLAR HEAT TO MAKE ELECTRICTY | $41,132 | $314,072 | Implemented |
UF0521 # 03 Y:2018 | 03 | 2018 | REPAIR AND ELIMINATE STEAM LEAKS | $13,844 | $562 | Implemented |
UF0521 # 04 Y:2018 | 04 | 2018 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $10,195 | $15,000 | Implemented |
UF0521 # 05 Y:2018 | 05 | 2018 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,972 | $4,143 | Implemented |
UF0521 # 06 Y:2018 | 06 | 2018 | IMPROVE COMBUSTION CONTROL CAPABILITY | $3,586 | $2,800 | Implemented |