IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,378

matching recommendations
Reset
SIC 203 Preserved Fruits And Vegetables
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0360 # 03 Y:2019 03 2019 TURN OFF EQUIPMENT WHEN NOT IN USE $9,735 $3,600 Implemented
MI0360 # 04 Y:2019 04 2019 OPTIMIZE PLANT POWER FACTOR $5,613 $13,630 Implemented
MI0360 # 05 Y:2019 05 2019 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,707 $3,634 Implemented
MI0360 # 06 Y:2019 06 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,330 $3,023 Implemented
MI0360 # 07 Y:2019 07 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,445 $1,980 Implemented
MI0360 # 08 Y:2019 08 2019 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $1,675 $3,764 Implemented
MI0360 # 09 Y:2019 09 2019 INSTALL OCCUPANCY SENSORS $751 $211 Implemented
MI0360 # 11 Y:2019 11 2019 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $476 $868 Implemented
MI0356 # 02 Y:2019 02 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $28,750 $42,002 Implemented
MI0356 # 03 Y:2019 03 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $25,615 $19,558 Implemented
MI0356 # 05 Y:2019 05 2019 REDUCE EXCESSIVE BOILER BLOWDOWN $10,928 $8,500 Implemented
MI0356 # 06 Y:2019 06 2019 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $8,814 $480 Implemented
MI0356 # 08 Y:2019 08 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,569 $2,020 Implemented
LE0476 # 03 Y:2019 03 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $96,090 $12,000 Implemented
LE0476 # 02 Y:2019 02 2019 REPAIR OR REPLACE STEAM TRAPS $19,944 $1,143 Implemented
LE0476 # 01 Y:2019 01 2019 ADJUST VENTS TO MINIMIZE ENERGY USE $43,794 $0 Implemented
SU0471 # 02 Y:2018 02 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,460 $2,625 Implemented
SU0471 # 05 Y:2018 05 2018 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $703 $1,240 Implemented
SU0471 # 06 Y:2018 06 2018 INSULATE FEEDWATER TANK $75 $172 Implemented
UF0521 # 01 Y:2018 01 2018 INCREASE AMOUNT OF CONDENSATE RETURNED $45,855 $11,386 Implemented
UF0521 # 02 Y:2018 02 2018 USE SOLAR HEAT TO MAKE ELECTRICTY $41,132 $314,072 Implemented
UF0521 # 03 Y:2018 03 2018 REPAIR AND ELIMINATE STEAM LEAKS $13,844 $562 Implemented
UF0521 # 04 Y:2018 04 2018 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $10,195 $15,000 Implemented
UF0521 # 05 Y:2018 05 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,972 $4,143 Implemented
UF0521 # 06 Y:2018 06 2018 IMPROVE COMBUSTION CONTROL CAPABILITY $3,586 $2,800 Implemented