IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,389

matching recommendations
Reset
SIC 203 Preserved Fruits And Vegetables
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0326 # 02 Y:1995 02 1995 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $4,330 $6,500 Implemented
CO0326 # 03 Y:1995 03 1995 INSTALL / REPAIR INSULATION ON STEAM LINES $2,790 $1,040 Implemented
CO0326 # 05 Y:1995 05 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,230 $530 Implemented
CO0326 # 06 Y:1995 06 1995 REPAIR AND ELIMINATE STEAM LEAKS $460 $160 Implemented
UD0450 # 01 Y:1995 01 1995 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $9,163 $0 Implemented
UD0450 # 02 Y:1995 02 1995 RECOVER WASTE HEAT FROM EQUIPMENT $4,096 $2,000 Implemented
UD0450 # 03 Y:1995 03 1995 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $6,103 $2,000 Implemented
UD0450 # 07 Y:1995 07 1995 METER WASTE WATER $61,699 $2,000 Implemented
OK0457 # 02 Y:1995 02 1995 DIRECT WARMEST AIR TO COMBUSTION INTAKE $2,691 $64 Implemented
OK0457 # 03 Y:1995 03 1995 INSTALL / REPAIR INSULATION ON STEAM LINES $1,741 $4,508 Implemented
OK0457 # 04 Y:1995 04 1995 INSULATE BARE EQUIPMENT $1,344 $3,612 Implemented
OK0457 # 05 Y:1995 05 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,224 $2,077 Implemented
OK0457 # 07 Y:1995 07 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $199 $240 Implemented
OK0457 # 08 Y:1995 08 1995 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $49 $76 Implemented
UL0115 # 02 Y:1994 02 1994 COVER OPEN TANKS $583 $330 Implemented
UL0115 # 03 Y:1994 03 1994 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $4,013 $4,000 Implemented
UL0115 # 05 Y:1994 05 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $132 $346 Implemented
KG0010 # 01 Y:1994 01 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $23,359 $48,100 Implemented
KG0010 # 03 Y:1994 03 1994 INSTALL TIMERS AND/OR THERMOSTATS $7,603 $1,050 Implemented
KG0010 # 05 Y:1994 05 1994 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $657 $2,500 Implemented
SF0037 # 01 Y:1994 01 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,919 $2,799 Implemented
SF0037 # 02 Y:1994 02 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,817 $1,277 Implemented
SF0037 # 04 Y:1994 04 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,271 $900 Implemented
SF0037 # 05 Y:1994 05 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,048 $1,189 Implemented
SF0037 # 06 Y:1994 06 1994 INSULATE BARE EQUIPMENT $225 $190 Implemented