IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,378

matching recommendations
Reset
SIC 203 Preserved Fruits And Vegetables
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0518 # 12 Y:2014 12 2014 USE PHOTOCELL CONTROLS $103 $80 Implemented
NC0518 # 13 Y:2014 13 2014 INSTALL OCCUPANCY SENSORS $437 $774 Implemented
MI0263 # 02 Y:2014 02 2014 TURN OFF EQUIPMENT WHEN NOT IN USE $11,051 $500 Implemented
MI0263 # 06 Y:2014 06 2014 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $3,052 $560 Implemented
MI0263 # 08 Y:2014 08 2014 INSTALL OCCUPANCY SENSORS $1,643 $497 Implemented
MI0263 # 09 Y:2014 09 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,472 $1,660 Implemented
MI0263 # 10 Y:2014 10 2014 USE OPTIMUM THICKNESS INSULATION $1,375 $360 Implemented
MI0263 # 11 Y:2014 11 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,317 $80 Implemented
MI0263 # 13 Y:2014 13 2014 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $409 $173 Implemented
DL0127 # 01 Y:2014 01 2014 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $6,800 $100 Implemented
DL0127 # 09 Y:2014 09 2014 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,800 $250 Implemented
DL0127 # 12 Y:2014 12 2014 INSTALL OCCUPANCY SENSORS $3,400 $2,300 Implemented
MI0257 # 01 Y:2014 01 2014 TURN OFF EQUIPMENT WHEN NOT IN USE $68,259 $15,600 Implemented
MI0257 # 02 Y:2014 02 2014 TURN OFF EQUIPMENT WHEN NOT IN USE $13,943 $3,100 Implemented
MI0257 # 05 Y:2014 05 2014 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $6,335 $2,660 Implemented
MI0257 # 06 Y:2014 06 2014 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $5,027 $80 Implemented
MI0257 # 07 Y:2014 07 2014 OPTIMIZE PLANT POWER FACTOR $4,923 $5,360 Implemented
MI0257 # 09 Y:2014 09 2014 INSTALL OCCUPANCY SENSORS $2,579 $290 Implemented
TT0125 # 01 Y:2014 01 2014 REPAIR AND ELIMINATE STEAM LEAKS $11,367 $1,500 Implemented
MZ0132 # 02 Y:2013 02 2013 INCREASE AMOUNT OF CONDENSATE RETURNED $28,581 $40,000 Implemented
MZ0132 # 05 Y:2013 05 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,108 $1,630 Implemented
MZ0132 # 07 Y:2013 07 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,152 $12,430 Implemented
MZ0132 # 08 Y:2013 08 2013 REDUCE EXCESSIVE BOILER BLOWDOWN $4,877 $2,600 Implemented
MZ0132 # 09 Y:2013 09 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,603 $3,100 Implemented
MZ0132 # 13 Y:2013 13 2013 INSTALL OCCUPANCY SENSORS $1,565 $640 Implemented