Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
28
matching recommendationsSIC | 203 | Preserved Fruits And Vegetables |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
GT0872 # 08 Y:2010 | 08 | 2010 | USE DIRECT FLAME IMPINGEMENT OR INFRARED PROCESSING FOR CHAMBER TYPE HEATING | $63,868 | $350,000 | Implemented |
GT0872 # 05 Y:2010 | 05 | 2010 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $9,328 | $20,000 | Implemented |
GT0872 # 04 Y:2010 | 04 | 2010 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $487 | $150,000 | Implemented |
GT0872 # 02 Y:2010 | 02 | 2010 | USE SYNTHETIC LUBRICANT | $9,230 | $0 | Implemented |
GT0872 # 01 Y:2010 | 01 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $960 | $1,300 | Implemented |
GT0832 # 07 Y:2006 | 07 | 2006 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $43,862 | $20,449 | Implemented |
GT0832 # 04 Y:2006 | 04 | 2006 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $21,105 | $0 | Implemented |
GT0832 # 03 Y:2006 | 03 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $14,559 | $45,000 | Implemented |
GT0832 # 01 Y:2006 | 01 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $12,160 | $1,250 | Implemented |
GT0832 # 09 Y:2006 | 09 | 2006 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $8,862 | $47,168 | Implemented |
GT0605 # 03 Y:1996 | 03 | 1996 | ELIMINATE LEAKS IN WATER LINES AND VALVES | $3,308 | $103 | Implemented |
GT0605 # 04 Y:1996 | 04 | 1996 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $6,090 | $1,450 | Implemented |
GT0605 # 05 Y:1996 | 05 | 1996 | METER WASTE WATER | $14,720 | $0 | Implemented |
GT0605 # 06 Y:1996 | 06 | 1996 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,120 | $4,300 | Implemented |
GT0605 # 07 Y:1996 | 07 | 1996 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $6,000 | $4,908 | Implemented |
GT0605 # 09 Y:1996 | 09 | 1996 | SELL / OFFER BY-PRODUCT AS ANIMAL FEED | $260,000 | $49,800 | Implemented |
GT0605 # 02 Y:1996 | 02 | 1996 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $3,110 | $3,500 | Implemented |
GT0605 # 01 Y:1996 | 01 | 1996 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $18,246 | $675 | Implemented |
UF0165 # 03 Y:1996 | 03 | 1996 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,841 | $1,350 | Implemented |
UF0165 # 04 Y:1996 | 04 | 1996 | CLEAN CONDENSER TUBES | $19,869 | $0 | Implemented |
GT0578 # 06 Y:1996 | 06 | 1996 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $21,090 | $34,520 | Implemented |
GT0578 # 04 Y:1996 | 04 | 1996 | TURN OFF EQUIPMENT WHEN NOT IN USE | $3,970 | $500 | Implemented |
GT0578 # 03 Y:1996 | 03 | 1996 | INCREASE AMOUNT OF CONDENSATE RETURNED | $27,914 | $12,000 | Implemented |
GT0578 # 02 Y:1996 | 02 | 1996 | ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS | $2,045 | $1,000 | Implemented |
GT0578 # 01 Y:1996 | 01 | 1996 | PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER | $21,137 | $50,000 | Implemented |