IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

31

matching recommendations
Reset
SIC 203 Preserved Fruits And Vegetables
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0358 # 03 Y:2004 03 2004 DIRECT WARMEST AIR TO COMBUSTION INTAKE $2,577 $1,000 Implemented
IA0358 # 08 Y:2004 08 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,955 $3,368 Implemented
IA0358 # 07 Y:2004 07 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $633 $633 Implemented
IA0358 # 11 Y:2004 11 2004 INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS $1,223 $100 Implemented
IA0358 # 04 Y:2004 04 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,528 $359 Implemented
IA0358 # 02 Y:2004 02 2004 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $36,969 $18,000 Implemented
IA0358 # 01 Y:2004 01 2004 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $24,532 $1,000 Implemented
IA0358 # 12 Y:2004 12 2004 USE STEAM CONDENSATE FOR HOT WATER SUPPLY (NON-POTABLE) $3,166 $40 Implemented
IA0355 # 11 Y:2004 11 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,521 $2 Implemented
IA0355 # 07 Y:2004 07 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $956 $230 Implemented
IA0355 # 06 Y:2004 06 2004 INSTALL / REPAIR INSULATION ON STEAM LINES $540 $359 Implemented
IA0355 # 05 Y:2004 05 2004 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $9,161 $3 Implemented
IA0355 # 04 Y:2004 04 2004 REDUCE EXCESSIVE BOILER BLOWDOWN $8,646 $2 Implemented
IA0355 # 03 Y:2004 03 2004 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $12,422 $17 Implemented
IA0355 # 01 Y:2004 01 2004 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,113 $300 Implemented
IA0330 # 08 Y:2003 08 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $866 $1,149 Implemented
IA0330 # 10 Y:2003 10 2003 INSTALL OCCUPANCY SENSORS $684 $1,064 Implemented
IA0330 # 09 Y:2003 09 2003 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $2,303 $0 Implemented
IA0330 # 07 Y:2003 07 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,173 $7,342 Implemented
IA0330 # 06 Y:2003 06 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,040 $99 Implemented
IA0330 # 05 Y:2003 05 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,233 $220 Implemented
IA0330 # 04 Y:2003 04 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $487 $23 Implemented
DS0124 # 01 Y:1998 01 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,385 $21,938 Implemented
DS0124 # 03 Y:1998 03 1998 OPTIMIZE PLANT POWER FACTOR $30,549 $25,900 Implemented
IA0185 # 03 Y:1997 03 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,249 $422 Implemented