IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

42

matching recommendations
Reset
SIC 203 Preserved Fruits And Vegetables
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BS0079 # 02 Y:2016 02 2016 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $154 $148 Implemented
OR0655 # 02 Y:2015 02 2015 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,161 $1,000 Implemented
OR0510 # 03 Y:2006 03 2006 RECOVER WASTE HEAT FROM EQUIPMENT $12,200 $35,000 Implemented
OR0510 # 07 Y:2006 07 2006 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,900 $19,200 Implemented
OR0510 # 01 Y:2006 01 2006 CAREFULLY CONTROL WATER LEVEL IN MASS FINISHING EQUIPMENT $61,000 $40,000 Implemented
OR0508 # 01 Y:2006 01 2006 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $69,500 $30,000 Implemented
OR0508 # 08 Y:2006 08 2006 UPGRADE CONTROLS ON COMPRESSORS $5,100 $30,000 Implemented
OR0508 # 02 Y:2006 02 2006 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $53,000 $2,000 Implemented
OR0508 # 03 Y:2006 03 2006 INSTALL / REPAIR INSULATION ON STEAM LINES $24,700 $5,000 Implemented
OR0508 # 06 Y:2006 06 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,200 $3,200 Implemented
OR0508 # 07 Y:2006 07 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,100 $12,000 Implemented
OR0478 # 03 Y:2005 03 2005 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $9,700 $49,100 Implemented
OR0478 # 02 Y:2005 02 2005 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,500 $1,900 Implemented
OR0478 # 01 Y:2005 01 2005 OPTIMIZE PLANT POWER FACTOR $11,420 $6,400 Implemented
OR0422 # 03 Y:2002 03 2002 USE STEAM CONDENSATE FOR HOT WATER SUPPLY (NON-POTABLE) $6,975 $5,500 Implemented
OR0422 # 04 Y:2002 04 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,944 $2,953 Implemented
OR0422 # 05 Y:2002 05 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $595 $0 Implemented
OR0422 # 01 Y:2002 01 2002 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $1,067 $0 Implemented
OR0422 # 02 Y:2002 02 2002 USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE $4,106 $2,000 Implemented
OR0272 # 02 Y:1996 02 1996 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $247,053 $1,000,000 Implemented
OR0272 # 04 Y:1996 04 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $923 $2,220 Implemented
OR0271 # 02 Y:1996 02 1996 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $22,000 $5,000 Implemented
OR0271 # 05 Y:1996 05 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,740 $16,120 Implemented
OR0271 # 07 Y:1996 07 1996 REPLACE WATER COOLING ON PROCESSES WITH AIR COOLING $5,480 $3,000 Implemented
OR0235 # 01 Y:1995 01 1995 ADD AREA LIGHTING SWITCHES $2,089 $2,200 Implemented