Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
54
matching recommendationsSIC | 203 | Preserved Fruits And Vegetables |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SU0148 # 08 Y:2002 | 08 | 2002 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $70 | $60 | Implemented |
SU0148 # 05 Y:2002 | 05 | 2002 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $9,006 | $3,700 | Implemented |
SU0148 # 02 Y:2002 | 02 | 2002 | ADJUST BURNERS FOR EFFICIENT OPERATION | $25,533 | $0 | Implemented |
SU0148 # 03 Y:2002 | 03 | 2002 | $14,400 | $20,000 | Implemented | |
SU0148 # 04 Y:2002 | 04 | 2002 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $31,584 | $17,490 | Implemented |
SU0148 # 07 Y:2002 | 07 | 2002 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $105 | $0 | Implemented |
OR0422 # 02 Y:2002 | 02 | 2002 | USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE | $4,106 | $2,000 | Implemented |
OR0422 # 04 Y:2002 | 04 | 2002 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $6,944 | $2,953 | Implemented |
OR0422 # 03 Y:2002 | 03 | 2002 | USE STEAM CONDENSATE FOR HOT WATER SUPPLY (NON-POTABLE) | $6,975 | $5,500 | Implemented |
OR0422 # 01 Y:2002 | 01 | 2002 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $1,067 | $0 | Implemented |
OR0422 # 05 Y:2002 | 05 | 2002 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $595 | $0 | Implemented |
SF0244 # 16 Y:2002 | 16 | 2002 | $101,519 | $350,000 | Implemented | |
SF0244 # 08 Y:2002 | 08 | 2002 | REDUCE EXCESSIVE BOILER BLOWDOWN | $6,671 | $6,000 | Implemented |
SF0244 # 07 Y:2002 | 07 | 2002 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $21,274 | $17,580 | Implemented |
SF0244 # 06 Y:2002 | 06 | 2002 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $6,304 | $4,110 | Implemented |
SF0244 # 04 Y:2002 | 04 | 2002 | REDUCE FLUID FLOW RATES | $31,494 | $16,627 | Implemented |
SF0244 # 02 Y:2002 | 02 | 2002 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $107,810 | $50,000 | Implemented |
LL0139 # 01 Y:2002 | 01 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,787 | $435 | Implemented |
LL0139 # 06 Y:2002 | 06 | 2002 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $9,786 | $0 | Implemented |
LL0139 # 07 Y:2002 | 07 | 2002 | PAY UTILITY BILLS ON TIME | $945 | $0 | Implemented |
LM0036 # 11 Y:2002 | 11 | 2002 | $199,710 | $14,000 | Implemented | |
LM0036 # 08 Y:2002 | 08 | 2002 | $101,250 | $15,800 | Implemented | |
LM0036 # 05 Y:2002 | 05 | 2002 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $21,342 | $4,800 | Implemented |
LM0036 # 03 Y:2002 | 03 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $15,015 | $550 | Implemented |
LM0036 # 02 Y:2002 | 02 | 2002 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,227 | $1,335 | Implemented |