IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

394

matching recommendations
Reset
SIC 203 Preserved Fruits And Vegetables
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0560 # 05 Y:2010 05 2010 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $3,400 $7,001 Not Implemented
OR0560 # 03 Y:2010 03 2010 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $8,047 $0 Not Implemented
OR0560 # 08 Y:2010 08 2010 INSTALL OCCUPANCY SENSORS $10,085 $70,024 Not Implemented
OR0560 # 02 Y:2010 02 2010 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $37,651 $90,666 Not Implemented
OR0560 # 01 Y:2010 01 2010 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $68,119 $26,207 Not Implemented
OR0558 # 06 Y:2010 06 2010 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $930 $1 Not Implemented
OR0558 # 05 Y:2010 05 2010 USE SOLAR HEAT TO MAKE ELECTRICTY $25,798 $379,829 Not Implemented
OR0558 # 04 Y:2010 04 2010 INSTALL OCCUPANCY SENSORS $14,738 $120,911 Implemented
OR0558 # 03 Y:2010 03 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,319 $4,935 Implemented
OR0558 # 02 Y:2010 02 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,102 $7,102 Implemented
OR0558 # 01 Y:2010 01 2010 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $6,602 $2,965 Implemented
OR0557 # 09 Y:2010 09 2010 USE SOLAR HEAT TO MAKE ELECTRICTY $23,079 $87,827 Not Implemented
OR0557 # 08 Y:2010 08 2010 INSTALL / REPAIR INSULATION ON STEAM LINES $615 $353 Not Implemented
OR0557 # 07 Y:2010 07 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,471 $1,471 Not Implemented
OR0557 # 06 Y:2010 06 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,035 $3,858 Not Implemented
OR0557 # 05 Y:2010 05 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,655 $1,655 Not Implemented
OR0557 # 04 Y:2010 04 2010 RECOVER WASTE HEAT FROM EQUIPMENT $1,893 $3,858 Not Implemented
OR0557 # 03 Y:2010 03 2010 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,416 $500 Not Implemented
OR0557 # 02 Y:2010 02 2010 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,866 $6,763 Not Implemented
OR0557 # 01 Y:2010 01 2010 RECOVER WASTE HEAT FROM EQUIPMENT $15,806 $14,882 Not Implemented
OR0556 # 08 Y:2010 08 2010 USE SOLAR HEAT TO MAKE ELECTRICTY $16,479 $65,003 Not Implemented
OR0556 # 07 Y:2010 07 2010 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $5,397 $11,734 Not Implemented
OR0556 # 06 Y:2010 06 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,320 $2,320 Implemented
OR0556 # 05 Y:2010 05 2010 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $3,131 $2,861 Implemented
OR0556 # 04 Y:2010 04 2010 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $8,987 $5,125 Not Implemented