Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,930
matching recommendationsSIC | 203 | Preserved Fruits And Vegetables |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NL0066 # 06 Y:2022 | 06 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,513 | $7,203 | Implemented |
NL0066 # 07 Y:2022 | 07 | 2022 | USE HEAT PUMP FOR SPACE CONDITIONING | $1,731 | $8,247 | Not Implemented |
NL0066 # 08 Y:2022 | 08 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $431 | $500 | Not Implemented |
LS2219 # 01 Y:2022 | 01 | 2022 | INSTALL SENSORS TO DETECT AND AVOID JAMS | $35,000 | $7,400 | Not Implemented |
LS2219 # 02 Y:2022 | 02 | 2022 | INSTALL TIMERS AND/OR THERMOSTATS | $679 | $150 | Not Implemented |
LS2219 # 03 Y:2022 | 03 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $389 | $225 | Implemented |
LS2219 # 04 Y:2022 | 04 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $676 | $1,121 | Implemented |
LS2219 # 05 Y:2022 | 05 | 2022 | USE PHOTOCELL CONTROLS | $281 | $740 | Not Implemented |
AM0844 # 01 Y:2022 | 01 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $101,477 | $114,525 | Implemented |
AM0844 # 02 Y:2022 | 02 | 2022 | MINIMIZE WATER USAGE | $30,169 | $3,770 | Not Implemented |
AM0844 # 03 Y:2022 | 03 | 2022 | TURN OFF EQUIPMENT WHEN NOT IN USE | $9,263 | $3,900 | Implemented |
AM0844 # 04 Y:2022 | 04 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $6,138 | $331 | Implemented |
AM0844 # 05 Y:2022 | 05 | 2022 | INSTALL OCCUPANCY SENSORS | $854 | $625 | Implemented |
SF0582 # 01 Y:2022 | 01 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $21,960 | $0 | Implemented |
SF0582 # 02 Y:2022 | 02 | 2022 | MODIFY STARTUP/SHUTDOWN TIMES | $7,144 | $0 | Implemented |
SF0582 # 03 Y:2022 | 03 | 2022 | INSTALL / REPAIR INSULATION ON STEAM LINES | $29,881 | $2,290 | Implemented |
SF0582 # 04 Y:2022 | 04 | 2022 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $10,294 | $2,290 | Implemented |
SF0582 # 05 Y:2022 | 05 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $22,836 | $41,117 | Implemented |
SF0582 # 06 Y:2022 | 06 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $24,257 | $45,587 | Implemented |
SF0582 # 07 Y:2022 | 07 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $8,094 | $17,764 | Implemented |
SF0582 # 08 Y:2022 | 08 | 2022 | INSULATE BARE EQUIPMENT | $376 | $961 | Not Implemented |
SF0582 # 09 Y:2022 | 09 | 2022 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $3,070 | $11,782 | Implemented |
SF0582 # 10 Y:2022 | 10 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,570 | $11,279 | Not Implemented |
SF0581 # 01 Y:2022 | 01 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $17,942 | $0 | Not Implemented |
SF0581 # 02 Y:2022 | 02 | 2022 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $488 | $0 | Not Implemented |